Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
You must pull a permit for any ADU in Folsom. California Government Code 65852.2 and AB 881 override local zoning restrictions, but Folsom still requires full plan review, foundation/framing/utility inspections, and compliance with local setbacks and parking rules.
Folsom has adopted California's state ADU laws, meaning you cannot be denied an ADU permit on zoning grounds alone — but you still need the permit itself. Folsom's Building Department enforces a strict 60-day shot clock (per AB 671) for ministerial ADU review, assuming your plans are complete and meet setback/utility/egress standards on day one. Unlike some neighboring jurisdictions (Rancho Cordova, Lincoln) that have tried to impose extra local restrictions, Folsom interprets state law as preemptive: you can build a junior ADU (up to 500 sq ft, no separate kitchen required) or a full ADU on any single-family lot, detached or attached, without owner-occupancy mandates. However, Folsom's foothill location (Climate Zones 5B–6B in the mountains, 3B–3C near the valley) triggers additional seismic and frost-depth requirements not seen in flatter Central Valley towns—your foundation design and frost protection must clear local geology review. The city's online permit portal is functional but phone-in intake remains active; initial intake and design feedback usually happen within 5–7 business days.

What happens if you skip the permit (and you needed one)

Folsom ADU permits — the key details

California Government Code 65852.2 (amended multiple times, most recently AB 881 in 2021) requires Folsom to approve ADUs by-right on any single-family lot, provided they meet objective standards in the local ordinance. This means Folsom cannot deny your ADU application on subjective grounds like 'neighborhood character' or 'traffic impact.' However, Folsom DOES enforce objective setbacks, lot coverage, height, and utility requirements—and these standards are tougher in the foothills than in the valley. A detached ADU in the El Dorado Hills neighborhoods (east of Highway 50, higher elevation) must meet 5-foot side setbacks and 10-foot rear setbacks per Folsom Municipal Code §14.15 (local ADU ordinance); attached ADUs have 3-foot setback relief but count against the primary dwelling's lot coverage cap of 60%. The city requires a separate utility meter (or sub-meter if shared) and either a dedicated parking space or a documented waiver if the ADU is within a half-mile of transit (Folsom does not have robust transit, so waivers are rare). State law also requires egress windows per IRC R310.1: every bedroom must have a window at least 5.7 sq ft operable, unless the bedroom qualifies as a junior ADU room (which has relaxed egress). Your plans must clearly show setbacks, utilities, egress, and lot coverage; Folsom's intake staff will flag non-compliant drawings within 48 hours, and you'll have 5 business days to resubmit.

Folsom's 60-day shot clock (AB 671 compliance) begins the day your application is deemed complete. Completeness means: signed architect/engineer plans, plot plan with setbacks and utilities, fire-rated wall details (if attached), foundation details showing frost protection and soil-bearing capacity, electrical one-line diagram, and proof of lot size (deed or county parcel report). If any item is missing, the city issues a '5-day letter' pausing the clock until you resubmit; resubmissions reset the 5-day clock, so a typical project with 1–2 resubmit rounds takes 75–90 days. Plan review is 'ministerial' (not discretionary), meaning staff cannot reject your ADU for subjective reasons, but they will catch IRC violations, setback breaches, and utility conflicts. Folsom's Building Department staff have indicated they approve most ADU applications without significant plan revision if the applicant uses a local architect familiar with foothills geology and the city's frost-depth requirements (12–30 inches in higher elevations).

Folsom's foothills location (Zones 5B–6B) imposes stricter foundation and frost-protection rules than flatter parts of Sacramento County. If your ADU site is above 1,500 feet elevation or within the designated Wildland-Urban Interface (WUI), you must show: (1) engineered foundation design with frost protection below the frost line (typically 24–30 inches in the mountains, 12–18 inches near the valley); (2) soil-bearing capacity report if the lot is on granitic or expansive-clay soil (common in the foothills); (3) seismic design per IBC 2022 (Folsom adopted the 2022 IBC in 2024, more recent than some adjacent jurisdictions). Detached ADUs trigger full foundation design review; attached units (garage conversions, second-story additions) avoid this if they share the primary dwelling's foundation. The city's geotechnical consultant will review soil reports; expect 2–3 weeks of back-and-forth if your lot is on problematic soil. This is where detached ADUs in El Dorado Hills neighborhoods (northeast Folsom) run into delays—granitic foothill soil is stable but requires a full report.

Parking and utility design are the two most common rejection points. Folsom requires one off-street parking space per ADU unless the city (or county transit agency, which is rare) documents that the ADU is within a half-mile of transit and in a 'transit village' overlay zone. No such zone exists in Folsom, so nearly every ADU applicant must show a dedicated parking space on the lot. If your lot is too small for a second space (the primary dwelling already takes 2 spaces on a typical small Folsom lot), you can apply for a parking variance, but Folsom rarely grants them—far easier to show the space on your plot plan upfront. Utility design must show: (1) separate electrical meter (or sub-meter with dedicated circuit breaker); (2) separate water meter if feasible, or sub-meter; (3) separate sewer/septic tap (or shared laterals with clear responsibility documented in an easement or recorded covenant if attached); (4) natural gas meter (if applicable). California law allows shared utilities, but Folsom's Building Department staff prefer separate meters because they simplify inspections and future title transfers. If you plan to rent the ADU, a separate meter is nearly mandatory—lenders and title companies flag shared utilities as a lending/saleability risk.

Owner-builder status (California Building & Professions Code § 7044) allows you to pull the permit yourself if the property is your principal residence and you plan to occupy it (or an immediate family member will). However, you must hire state-licensed contractors for electrical work (California Electrical Contractor License) and plumbing (California Plumbing Contractor License); you can frame, drywall, and install HVAC yourself if you pass Folsom's inspections. The city's Building Department staff will verify your owner-builder affidavit at intake; if you later transfer the property or the ADU becomes purely rental, you may face liability or title issues. Most ADU applicants in Folsom use a licensed general contractor (GC) to avoid this complication; typical GC markup on a detached ADU is 15–25%, so a $150,000 construction cost becomes $172,000–$187,000. Plan review and permit fees typically run $3,000–$5,000; add $2,000–$3,000 for utility design/engineering, another $1,500–$2,500 for soils or seismic engineering if required. Total 'soft costs' (design, permits, engineering) for a detached ADU in Folsom range $6,500–$10,500; attached conversions (garage-to-ADU) cost $3,000–$6,500 in soft costs because foundation/soils work is minimal.

Three Folsom accessory dwelling unit (adu) scenarios

Scenario A
Detached 800 sq ft ADU with 2 bedrooms, separate utilities, rear yard, El Dorado Hills neighborhood (foothills, Zone 5B)
You own a 0.4-acre lot in the El Dorado Hills neighborhoods east of Highway 50, uphill from downtown Folsom. Your primary dwelling sits at 1,700 feet elevation; you want to build a detached ADU (800 sq ft, 2-bedroom, full kitchen and bathroom) in the rear yard, 25 feet from the rear property line and 6 feet from the east side property line. This scenario is TYPICAL for foothills ADUs and showcases Folsom's geotechnical focus. You must submit: (1) grading and soils report (granitic foothill soil requires bearing-capacity confirmation, typically $1,200–$1,800); (2) foundation design showing frost protection at 24–28 inches (more than the valley standard of 12–18 inches); (3) site plan with 5-foot side setback compliance (you're at 6 feet, compliant), 10-foot rear setback (you're at 25 feet, compliant); (4) utility plan showing separate electric meter, separate water meter (valley has good pressure; foothills may require a booster pump, add $800–$1,200), separate sewer lateral. Plan review takes 45–60 days because staff must review the geotechnical report and coordinate with the city's engineering consultant. Foundation inspection occurs before framing; rough framing inspection after wall sheathing; final inspection after all work. Total permit and plan-review fees: $4,200–$5,500 (based on $150,000 valuation at 2.8–3.7% of construction cost). Construction timeline: 4–6 months for a full detached ADU with site prep and utilities. No parking variance needed (you have space for a dedicated spot). Separate meter cost: $2,000–$3,500 (utility company charges for new electrical service and water meter). Post-permit inspection timeline: 8–12 weeks from permit issuance to final sign-off if you stay on schedule with inspections.
Permit required | Geotechnical report required ($1,200–$1,800) | 60-day shot clock (AB 671) | Separate utilities mandatory | Frost depth 24–28 inches | Parking space required | Foothills elevation requires seismic design | Total soft costs $6,500–$10,500 | Total construction $140,000–$200,000
Scenario B
Junior ADU (400 sq ft) carved from existing 3-car garage, no separate kitchen (kitchenette only), existing utilities, valley floor near downtown
You own a 0.35-acre lot on the valley floor (Folsom downtown area, Zone 3B), near Folsom State Historic Park. Your primary home has a 3-car garage; you want to convert half of it to a junior ADU (400 sq ft, 1 bedroom, kitchenette and 3/4-bath, but no separate kitchen per Government Code 65852.22 definition). This scenario showcases Folsom's attachment-based ADU rules and kitchen trade-offs. A junior ADU has relaxed egress requirements: the bedroom window can be smaller (minimum 5 sq ft instead of 5.7 sq ft), and you can use an existing doorway to the primary dwelling as your exit if you install fire-rated double doors (2-hour fire rating). You must submit: (1) remodeling plans showing existing garage structure, proposed wall framing, and fire-rated partition wall between the ADU and the primary dwelling (fire rating depends on whether you share utilities—if you do, 1-hour minimum; if separate, 0-hour is acceptable but Folsom typically requires 1-hour); (2) electrical plan showing either shared meter with sub-panel (less expensive, $500–$800) or separate meter ($1,500–$2,500); (3) utility plan showing shared or split water/sewer; (4) site plan with lot coverage calculation (garage conversion typically reduces lot coverage because you're not adding new footprint, so this is easier to approve). No new foundation is required (you're using the existing garage slab and the primary dwelling foundation). Plan review is faster: 30–45 days because there is no new grading or soils work. Parking is a non-issue (the ADU uses one of the three garage spaces; the primary dwelling retains two). Permit fees are lower: $2,200–$3,500 (conversion projects have lower valuation—typically $50,000–$80,000 estimated construction cost, so fees are 3.5–4.5% of valuation). Inspections: foundation/framing inspection (limited scope—just the new partition wall and any new electrical), rough electrical, insulation/drywall, final building + electrical. Utility company may charge $400–$800 for sub-meter installation if you share utilities. Total soft costs: $2,500–$4,000. Construction timeline: 8–12 weeks for garage conversion (faster than new detached ADU). Post-permit final sign-off: 6–10 weeks if you schedule inspections promptly. This scenario is faster and cheaper because you avoid geotechnical work, new foundation, and site grading—all Folsom foothills issues that slow detached ADUs.
Permit required | Junior ADU (no separate kitchen) | Garage conversion, no new foundation | 60-day shot clock applies | Shared utilities allowed (kitchenette only) | Fire-rated partition wall required (1-hour) | Parking space already exists | Valley floor, no geotechnical work | Plan review 30–45 days | Total soft costs $2,500–$4,000 | Total construction $50,000–$80,000
Scenario C
Second-story ADU addition (700 sq ft, 1 bedroom, separate entrance via external staircase) attached to primary dwelling, north-facing lot, new utilities, historic Folsom neighborhood
You own a historic 1920s bungalow in Old Folsom (downtown, Sutter Street area, Zone 3B). Your lot is 0.28 acres, narrow and north-facing. You want to add a second-story ADU (700 sq ft, 1 bed, full kitchen, separate exterior staircase on the north side of the house). This scenario showcases Folsom's historic-neighborhood overlay and attachment setback rules. Historic Folsom has a Preservation District overlay (Chapter 14.18, Folsom Municipal Code) that requires Design Review Commission approval for exterior changes visible from the street. Your external staircase is on the north (side-yard) facade, which may be visible from the street depending on lot orientation—you will need a Design Review conditional use permit BEFORE the building permit can be issued. This adds 4–6 weeks to your timeline and requires a full architectural elevation drawing showing materials, colors, and compatibility with the historic district. Setback rules for attached ADUs: 0-foot setback from the primary dwelling is allowed (you're building on the existing wall), but the ADU must not exceed the primary dwelling's height or lot coverage by more than 15%. Your 1920s bungalow is probably 25–28 feet tall; a second-story ADU addition is typically 20–24 feet from the grade to the top of the new roof, compliant. Utility design: new electrical service (existing panel may not have capacity), new water meter (separate if feasible), separate sewer tap or shared lateral. Plan review: 50–70 days (60-day shot clock minus Design Review delays). Building permits cannot be issued until Design Review sign-off. Parking: the lot is too narrow for a second parking space; you will apply for a parking variance. Folsom rarely grants parking variances for ADUs, so be prepared for a condition: the primary dwelling must retain one dedicated space, and the ADU uses on-street parking or a shared driveway easement with a neighbor (if available). Foundation: the new second-story ADU does NOT require a new foundation if the existing primary-dwelling foundation is adequate (city will verify during plan review). If the existing foundation is deemed insufficient, you must retrofit (underpinning), which adds $10,000–$20,000 and 4–6 weeks. Seismic design: 2022 IBC requires lateral load analysis for the new addition; the existing 1920s bungalow may not have adequate shear-wall bracing, so the city's engineer will likely require temporary bracing or new shear walls in the primary dwelling, adding cost and complexity. Total soft costs: $8,000–$12,000 (Design Review, architecture, structural engineering, geotechnical clearance if foundation is questionable). Construction timeline: 12–18 weeks (slower than detached ADU because of historic-district process and potential foundation upgrades). This scenario illustrates how Folsom's historic overlay and soil/seismic requirements compound ADU timelines.
Permit required | Design Review required (historic district overlay) | 60-day shot clock + 4–6 weeks Design Review | Attached ADU (second story) | Seismic design required | Foundation verification required | Parking variance unlikely | Separate utilities required | Valley floor but historic constraints | Total soft costs $8,000–$12,000 | Total construction $120,000–$180,000 | Timeline 12–18 weeks

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

Folsom's foothills geology: frost depth, seismic, and soil-bearing capacity

Folsom straddles two climate zones and soil types: the valley floor (Zone 3B, near downtown and Folsom Lake) with clay-loam soil and 12–18 inch frost depth, and the foothills (Zones 5B–6B, El Dorado Hills neighborhoods) with granitic soil and 24–30 inch frost depth. This split explains why detached ADUs in the hills take longer to permit than attached units in the valley. A detached ADU foundation must rest on undisturbed soil or properly compacted fill, below the frost line. If your foothills lot has been graded or filled, the city requires a geotechnical engineer to certify that the soil is properly compacted and bearing-capacity adequate (typically 2,000–3,000 PSF for a one-story ADU). Granitic foothill soil is generally stable, but the report costs $1,200–$1,800 and requires 2–3 weeks of testing. Folsom's Building Department will not issue a foundation permit without this report.

Seismic design (2022 IBC adoption in 2024) is more aggressive for ADUs in Folsom foothills. The city is in Seismic Design Category D, which requires lateral load analysis and shear-wall bracing for all structures over 35 feet in length and free-standing detached ADUs with spans exceeding 30 feet. A typical 800 sq ft detached ADU (32 x 28 feet) will likely trigger seismic design requirements. Your engineer must show that the foundation, framing, and connections resist the calculated seismic load (roughly 10–12% of the weight of the structure). This adds $1,500–$2,500 in engineering fees and often requires reinforced-concrete footings or steel connections, raising foundation costs by 15–25%. Valley-floor ADUs (near downtown) are in a slightly lower seismic category, but Folsom's Building Department applies the higher standard uniformly to be conservative.

Expansive-clay soil is NOT a common problem in Folsom itself, but it occurs on the western edge (near Rancho Murieta) and in some older developments near Folsom Lake. If your lot is in a mapped expansive-soil area, the geotechnical report must address shrink-swell potential and recommend soil stabilization (lime or cement injection, typically $2,000–$5,000 under the foundation). This is rare for foothills ADUs but common enough that Folsom staff will ask if you're in a known area. Check the county's geotechnical map or ask the city Building Department at intake: 'Is my lot in an expansive-soil zone?' The answer will determine whether you need specialized foundation design.

Folsom's utility metering and shared-infrastructure rules for ADUs

California Government Code 65852.2 allows shared utilities (water, sewer, electrical) between the primary dwelling and ADU, but Folsom's Building Department and utility companies (Sacramento Municipal Utility District for electric, City of Folsom for water/sewer) impose practical requirements that often make separate metering easier. Separate electrical meters cost $1,500–$2,500 (utility company labor + service upgrade if the primary panel is near capacity). A sub-meter (shared main service, but a dedicated circuit breaker and sub-panel for the ADU) costs $500–$800 and satisfies both state law and the city's plan-review requirements. The trade-off: sub-meters are cheaper upfront but create future complications if you sell the property or refinance—lenders sometimes require separate meters for ADU units, and title companies flag sub-meter arrangements as a potential lien or easement issue.

Sewer and water are more expensive to separate. A separate water meter typically requires a second tap on the city's main line (City of Folsom Water Division), costing $2,500–$4,500 (tap fee + meter box installation). If a second tap is not feasible (e.g., the ADU is in the rear of a deep lot and the sewer/water mains are on the opposite side), you can share the lateral but must show a recorded easement or covenant giving the ADU legal access to the main-dwelling water and sewer lines. This covenant is recorded with the county assessor and binds future owners, signaling to lenders and title companies that the ADU relies on the primary dwelling's utilities—some lenders view this as a risk. Separate sewer is easier: most lots have multiple stub lines; if not, a new lateral can be tapped for $1,500–$2,500. Natural gas (if applicable) is also straightforward: separate meter or shared line with a sub-meter, typically $400–$1,000.

Folsom's utility companies have standard ADU checklist requirements. The city Building Department will not schedule a final utility inspection until the utility company confirms the meter(s) are installed and registered. For new construction, the water and electrical utility companies require 5–7 business days lead time; for conversions, sometimes same-day inspection is possible. Plan your utility work carefully: order meters and service upgrades 2–3 weeks before you want final inspection, because utility company scheduling is often booked out. Many ADU applicants miss their target move-in date because they underestimated utility-company lead times, not building-department timelines.

City of Folsom Building Department
50 Natoma Street, Folsom, CA 95630 (Folsom City Hall)
Phone: (916) 461-6700 (main line; ask for Building Department) | https://www.folsom.ca.us/government/public-services/building-safety (check for online permit portal link)
Monday–Friday 8:00 AM – 5:00 PM (verify at folsom.ca.us)

Common questions

Can I build a junior ADU instead of a full ADU to avoid the kitchen requirement?

Yes. California Government Code 65852.22 allows a 'junior accessory dwelling unit' up to 500 sq ft with a kitchenette (sink, range, refrigerator) but NOT a full kitchen with separate dining area. Junior ADUs have faster permitting (30–45 days in Folsom vs. 60 days for full ADUs) and lower construction costs ($40,000–$70,000 vs. $120,000–$200,000 for detached). However, you cannot have both a junior ADU and a standard ADU on the same lot—it's either/or. Folsom's Building Department treats junior ADU applications as ministerial, similar to full ADUs, so the legal timeline is the same, but plan review is lighter because foundation/seismic requirements are minimal if you're converting an existing garage or attic.

Do I need owner-occupancy approval or a covenant to build an ADU in Folsom?

No. California AB 881 (effective 2022) eliminated owner-occupancy requirements statewide. Folsom cannot require you to occupy the primary dwelling or the ADU. However, if you're pulling the permit as an 'owner-builder' (California B&P Code § 7044), you must own the property and intend to occupy one of the units (primary or ADU). If the property is purely investment, you must use a licensed general contractor, not owner-builder status. Rental ADUs are explicitly allowed under state law; no local covenant or recording is required.

What is the 60-day shot clock, and what happens if Folsom misses it?

AB 671 (Government Code 65852.3) requires local agencies to approve or deny ADU applications within 60 days if the application is 'complete'—meaning all required drawings, soils reports, utility plans, and fees are submitted. If Folsom does not approve by day 60, the application is deemed approved by operation of law, and the city must issue the permit. In practice, Folsom's Building Department meets the deadline by requiring completeness upfront (5-day letters for missing items) and accepting resubmissions within the 60-day window. If you disagree with the city's completeness determination, you can request a 'deemed approved' order from the city manager or planning director. This is rare; most Folsom ADU applicants receive approval within 50–60 days if they provide complete plans initially.

Can I combine a detached ADU with an attached junior ADU on the same lot?

No. California law (Government Code 65852.2) allows one ADU per single-family lot, and that ADU can be detached, attached, or a junior unit—but only one total. You cannot stack a detached ADU plus a garage-conversion junior ADU. If your lot is large and you want maximum rental income, choose a detached 2-bedroom full ADU (800 sq ft) over a junior ADU. If your lot is small or you want to minimize construction cost, choose a junior ADU or garage conversion. Folsom's Building Department will flag any application showing two separate ADU structures and require you to consolidate.

Do I need to pay for a design review if my ADU is in the historic district?

Yes, if any part of the ADU is visible from the public right-of-way (the street). Folsom's Historic Preservation District (Chapter 14.18, Folsom Municipal Code) requires Design Review Commission approval for exterior modifications. A second-story ADU addition with an external staircase on the front facade will need Design Review. A detached ADU set far back in the rear yard (not visible from the street) may be exempt, but you must ask the Planning Department at intake. Design Review adds 4–6 weeks and requires an architectural elevation drawing ($1,500–$2,500 from an architect). If you're in the historic district, budget extra time and cost.

What happens if I want to build in the Wildland-Urban Interface (WUI) zone on the foothills?

Folsom's WUI zone (northwest of Highway 50, near the American River) triggers additional fire-safety requirements: defensible space (typically 100 feet), fire-resistant roofing (Class A), tempered windows, and in some cases, an additional fire-sprinkler system for the ADU. If your lot is in the WUI, the city will flag it at intake, and you'll need to submit a fire-safety plan with the building permit. These upgrades add $3,000–$8,000 to construction costs. Check with Folsom's Fire Department or the Building Department to confirm WUI status; you can also look up your parcel on the California Department of Forestry and Fire Protection (CalFire) map online.

Can I get a parking variance for my ADU if my lot is too small?

Unlikely. Folsom requires one off-street parking space per ADU unless the ADU is within a half-mile of transit (rare in Folsom, as the city has limited public transit). Parking variances are granted only in exceptional circumstances—for example, if your lot is on a steep slope and adding a parking space would trigger major grading. Most applicants must show a dedicated parking space on their plot plan. If your lot truly cannot accommodate a second space, discuss options with the Planning Department at intake: a neighbor's shared driveway, an easement, or on-street permit parking (city-dependent). Design your lot plan with a parking space included from the start.

How much do permit fees typically cost, and is there a way to estimate them before applying?

Folsom's permit fees are based on estimated construction valuation. A detached 800 sq ft ADU is typically valued at $120,000–$150,000 (industry-standard $150–$185 per sq ft in Northern California). Permit fees are roughly 2.8–3.5% of valuation, so $3,400–$5,250 for a full permit and plan review. Add separate engineering fees ($1,500–$2,500 for soils/seismic), utility design ($1,000–$1,500), and architect/designer fees ($2,000–$5,000 if you need custom plans). Total soft costs: $6,500–$10,500 before construction begins. Folsom's Building Department provides a preliminary fee estimate if you call or email with your lot size and proposed ADU dimensions; they can quote within 24 hours.

Can I pull an owner-builder permit if I have a mortgage?

Yes, California B&P Code § 7044 allows owner-builders with mortgages, as long as the property is your principal residence. Your lender must approve the ADU project (most do, under California law), and you must sign an owner-builder affidavit swearing that you intend to occupy the primary dwelling or the ADU. If you later sell the property or convert the ADU to purely rental, you may face title or liability complications, but the permit itself is legal. Many owner-builders in Folsom pull the permit, hire a general contractor or sub-contractors, and manage the project themselves to save money. Trade-licensed contractors (electrician, plumber) are required by law; you cannot do electrical or plumbing work yourself, even as an owner-builder.

What inspections are required, and how long do they typically take?

Folsom requires: (1) foundation/footing inspection (before concrete pour or before framing on existing foundation), (2) framing inspection (walls sheathed, roof framing complete), (3) rough electrical/mechanical/plumbing inspection (before drywall), (4) insulation/drywall inspection (after drywall is installed), (5) final building inspection (all work complete), and (6) final electrical/utility inspection (meters registered and operational). Some inspections can be combined (e.g., rough trades all at once), but the city requires at least 4–5 separate inspection appointments. Each inspection takes 1–2 hours; inspectors schedule 5–7 business days in advance. Most ADU projects schedule one inspection every 2–3 weeks, so total inspection timeline is 8–12 weeks. If you miss an inspection appointment, the clock resets, so stay on schedule.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current accessory dwelling unit (adu) permit requirements with the City of Folsom Building Department before starting your project.