Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
You absolutely need a permit for any ADU in Porterville — detached, garage conversion, junior ADU, or above-garage. California state law (Government Code 65852.2 and recent amendments) overrides local zoning and sets a 60-day approval timeline; Porterville cannot deny you based on parking, setbacks, or lot coverage if you meet state minimums.
Porterville sits in Tulare County on the southern San Joaquin Valley floor, where the City of Porterville Planning Department has formally adopted state ADU law but retains some local discretion on design review and utility infrastructure — particularly because the valley's expansive clay soils and limited water resources create unique permitting conditions not present in coastal California cities. Unlike some California municipalities that add discretionary overlays (historic districts, overlay zones), Porterville's primary leverage points are fire-flow capacity and septic adequacy if you're off-mains. State law (AB 68, AB 881, SB 9) requires Porterville to approve compliant ADUs within 60 days of a complete application; the city cannot impose parking minimums, setback waivers, or lot-coverage caps that exceed state ADU-specific standards. However, Porterville does require utility plans (water/sewer or septic) and fire-marshal sign-off on water pressure — both of which can slow plan review. The City of Porterville Building Department processes ADU permits through its online portal with a 60-day ministerial approval window; expect 8–14 weeks total if you need septic or water-district coordination, or 6–10 weeks if you're on city water and sewer.

What happens if you skip the permit (and you needed one)

Porterville ADU permits — the key details

California Government Code 65852.2 (as amended by AB 68, AB 881, and SB 9) preempts Porterville's local zoning and requires ministerial approval of ADUs on single-family residential lots if they meet state standards: an ADU must be no larger than 1,200 square feet (or 50% of the primary dwelling's gross floor area, whichever is smaller); a junior ADU (JADU) can be up to 500 square feet with a shared kitchen; a detached ADU on a lot 2,500 square feet or smaller is exempt from setback and lot-coverage requirements; an above-garage ADU on an existing detached garage counts as new construction. Porterville cannot impose parking requirements for ADUs, cannot require owner-occupancy of either the primary residence or ADU (state law eliminated that), cannot deny you based on architectural style or design review that goes beyond fire safety, and must approve your project within 60 days of a complete application. The city's role is administrative: verify that your plans meet California Building Code (CBC, which mirrors the 2022 IBC), confirm utility capacity, and sign off on septic or water-quality conditions. If your lot is in a flood zone (check FEMA flood maps and Tulare County floodplain maps), you'll need floodplain elevation certification — this can add 2–4 weeks but does not stop approval.

Utility infrastructure is the single biggest local friction point in Porterville. The city sits on the valley's water-stressed aquifer; if your property is on city water and sewer, the Porterville Public Works Department will verify water-main size and sewer-line capacity, which usually takes 1–2 weeks. If you're on a septic system (common in unincorporated Tulare County pockets near Porterville limits), you must hire a licensed septic contractor to design a system per Title 27 (California Code of Regulations); the county Health and Human Services Agency (not Porterville) must approve the septic design, adding 3–6 weeks. Dual water meters are required if you want separate utilities; a sub-meter costs $500–$1,200 and requires Public Works sign-off. Fire flow (water pressure and volume for fire suppression) is Porterville's third utility gating factor — the Porterville Fire Department will confirm that your lot's water line can deliver 500+ GPM at 20 PSI; in older neighborhoods or at lot edges, this can trigger main upgrades (cost: $3,000–$10,000, charged to property owner). Request utility-capacity letters early (Week 1) to avoid last-minute surprises.

Porterville's building-permit fees for ADUs are calculated on valuation: plan-review fee (~$300–$500), building permit (~1.5–2% of construction cost, typically $800–$2,500 for a 600-sq-ft ADU budgeted at $80,000–$100 per sq ft), and development impact fees (~$2,000–$4,000 for ADU-specific fire/police/schools allocations). A rough estimate: $3,500–$7,500 in municipal fees alone; add $500–$1,500 for utility-capacity letters and plan review by the fire marshal. If your project requires septic (county-level), add $1,000–$2,000 for septic design and approval. If water-main upgrades are triggered, the city will bill you for the full upgrade (pass-through charges, not a permit fee) — these can run $5,000–$15,000. Porterville does NOT charge ADU-specific parking in-lieu fees (state law bars this), but the city may charge standard development impact fees. Owner-builders are allowed for ADU permits under California Business & Professions Code § 7044, but electrical and plumbing must be done by licensed contractors or by the owner if the owner holds an electrical or plumbing license; all work is inspected the same way as contractor work.

The application package for Porterville requires: (1) completed ADU application form (available on the city's permit portal or at city hall); (2) site plan showing lot dimensions, setbacks, ADU footprint, parking (if provided), and utility connections; (3) floor plan and elevation drawings to CBC standards (roof pitch, window placement, egress); (4) utility-capacity letters (water, sewer/septic, fire flow); (5) proof of property ownership; (6) if detached, foundation design per IRC R403; (7) if garage conversion, new exit door/window per IRC R310 (emergency egress window, sill height ≤44 inches, clear opening ≥5.7 sq ft). The city posts application checklists on its portal — start with those to avoid resubmittals. Porterville's plan-review turnaround is typically 10–15 business days for staff comments; expect 1–3 resubmittals for minor issues (utility-letter revisions, egress window size clarification, setback re-dimensioning). Once approved, you'll receive a building permit valid for 12 months; construction inspection sequence is standard (foundation, framing, rough trades, insulation, drywall, final). Plan for 8–14 weeks from application submission to building-permit issuance if utilities are straightforward, or 12–18 weeks if septic or water-main upgrades are needed.

Owner-occupancy of the primary residence or ADU is no longer required in California (AB 68 eliminated this in 2019). You can rent out both the primary house and the ADU simultaneously — Porterville's local code does not override this state protection. However, if you're in unincorporated Tulare County (outside Porterville city limits), the county still enforces owner-occupancy; confirm your property's jurisdiction before relying on state preemption. Parking is not required by Porterville for ADUs, but if you provide a garage or carport, that counts as one parking space. Rent control does not apply to ADUs in Porterville (state law caps ADU rent increases at 5% + CPI annually, but Porterville cannot impose additional local rent caps). Zoning restrictions on lot size, density, and setbacks are preempted by state law if your project meets the ADU thresholds; Porterville cannot use 'single-family residential' zoning to block you. Insurance, property tax, and financing are separate from permitting — work with your lender and insurance agent in parallel with the permit process, but permits are not conditioned on insurance or financing approval.

Three Porterville accessory dwelling unit (adu) scenarios

Scenario A
Detached 750-sq-ft ADU on 0.35-acre lot, existing well and septic, Porterville city limits, owner-builder framing + licensed electrician/plumber
You own a 0.35-acre (15,200 sq ft) residential lot in south Porterville with an existing primary home, a functioning well, and a septic system rated for 2 bedrooms. You want to build a detached 750-sq-ft ADU with 2 bedrooms, separate kitchen, and its own entrance; you'll do framing yourself but hire licensed trades for electrical and plumbing. State law allows a detached ADU up to 1,200 sq ft or 50% of primary-home size (whichever is smaller); your 750 sq ft qualifies. The local friction is septic: Tulare County Health & Human Services must approve a revised septic-system capacity letter showing the original system + ADU loads (now 4 bedrooms total). Your project timeline: Week 1, request septic-design letter from county ($500–$800, 2-week turnaround); Week 2–3, submit ADU permit application with site plan, floor plan, elevations, and septic approval letter to Porterville Building Department; Week 3–4, plan-review comments from city (expect 1–2 minor items: egress window size, foundation detail); Week 5–6, resubmit corrected plans; Week 6–7, city issues building permit ($1,200–$2,000 in permit fees). Inspect foundation, framing, rough electrical/plumbing, insulation, drywall, final (6–8 inspections over 12–16 weeks of construction). Total permit cost: $1,800–$2,800 (permit + septic letter + minor plan corrections). Build cost estimate: $60,000–$75,000 (owner-built framing, licensed trades). Septic constraint: if county determines the existing system cannot handle 4 bedrooms, you must upgrade (new system, $8,000–$15,000, adds 4–6 weeks to schedule).
Permit required | Septic system upgrade may be required | County septic approval letter required | Well water OK if capacity verified | Detached ≤1,200 sq ft no setback variance needed | Owner-builder allowed (framing only) | Licensed electrician + plumber required | Total permit fees $1,800–$2,800 | Build cost $60,000–$75,000 | Timeline 6–14 weeks permitting + septic
Scenario B
Garage conversion to junior ADU (JADU) 400 sq ft, shared kitchen with primary home, existing city water/sewer, south Porterville on water-main edge
You have a detached 2-car garage (20x24 ft) on a 0.25-acre residential lot in south Porterville, on city water and sewer. You want to convert it to a junior ADU (JADU) — a 400-sq-ft studio with a sleeping area, bathroom, and kitchenette (sink, microwave, mini-fridge, no stovetop) that shares a main kitchen connection with the primary home via an internal door. State law permits JADUs up to 500 sq ft; your 400 sq ft qualifies, and shared kitchen is allowed. Local friction: fire-flow capacity. The fire marshal's office will verify that your water main (serving 6–8 homes on your block) can deliver 500+ GPM at 20 PSI for fire suppression. If the main is undersized (older 4-inch cast iron is a red flag), the city will require a water-main upgrade ($5,000–$10,000, charged to you). Your project timeline: Week 1, request water-capacity letter from Public Works (1 week, free); if capacity is OK, proceed; if not, get water-main upgrade quote and timeline (typically 6–8 weeks for city contract work). Week 2, submit JADU permit application with site plan (showing garage footprint, shared-kitchen connection, new egress window location), floor plan (kitchenette detail, bathroom, sleeping area), elevations, and utility-capacity letters. Week 3–4, plan-review comments (typically: egress window location, kitchen connection detail, electrical panel location); Week 4–5, resubmit; Week 5–6, city issues building permit ($1,000–$1,800). Inspect foundation (if any modifications), framing (removal of garage doors, new wall framing), egress window installation, rough electrical, drywall, final (5–6 inspections, 8–12 weeks of construction). If water-main upgrade is required, add 8–10 weeks before permitting can proceed. Egress constraint: new egress window must meet IRC R310 (clear opening 5.7+ sq ft, sill height ≤44 inches from floor); this usually means cutting into the garage wall facing a yard or driveway, not toward the street. Total permit cost without main upgrade: $1,500–$2,300. With water-main upgrade: $6,500–$12,300 (city bills you separately for main work).
Permit required | Garage conversion to JADU (shared kitchen allowed) | Egress window mandatory per IRC R310 | Water-flow test required (may trigger main upgrade) | City water/sewer OK | JADU ≤500 sq ft no setback variance | No parking required | Permit fees $1,000–$1,800 | Water-main upgrade possible $5,000–$10,000 | Timeline 6–16 weeks (8–10 weeks if main upgrade)
Scenario C
Above-garage ADU (new construction), 600 sq ft, 1 bedroom, ground-floor ADU, separate utilities with sub-meter, north Porterville newer subdivision, licensed contractor build
You own a 0.4-acre lot in a newer north Porterville subdivision (Westridge or similar, post-2000) with an existing 2-car detached garage. You want to build a 600-sq-ft above-garage ADU (second story on the garage), with 1 bedroom, full kitchen, full bathroom, separate entrance via exterior stairs, separate water meter, and separate electrical sub-panel. State law treats above-garage ADUs as new construction (not a conversion); the 600 sq ft meets size caps. Local friction: design review and utility sub-meter coordination. North Porterville has seen significant density increases; the city planning department may request design-review comments (roofline consistency, exterior materials, screening of stairs). This is not a hard stop — state law allows 'ministerial' approval only, meaning the city cannot impose discretionary design conditions — but staff may flag compatibility issues that require minor revisions (e.g., roofline pitch matching the primary home). Your project timeline: Week 1–2, hire architect/designer to produce site plan, floor plan, and elevations that match primary-home roofline and materials; Week 2, submit ADU application with plans, water-sub-meter specification (size, location on property, photo of existing main meter), electrical sub-panel single-line diagram, fire-flow letter from Public Works. Week 3–4, plan-review comments (expect 1–2 design-note requests and electrical sub-panel clarifications); Week 4–5, resubmit. Week 5–6, city issues building permit ($1,500–$2,500). Inspect foundation (new above-garage), framing, rough electrical/plumbing, insulation, drywall, roofing, final (7–8 inspections, 14–18 weeks of construction). Sub-meter installation: Public Works will inspect and approve the sub-meter before you receive a final certificate of occupancy; costs $700–$1,200 (parts + labor). Utility cost estimate: $800–$1,500 (sub-meter + electrical panel). Permit cost: $2,000–$2,800. Build cost estimate: $75,000–$90,000 (new above-garage construction, licensed contractor). No water-main issues expected in newer subdivisions; fire flow is usually adequate. Timeline: 6–10 weeks permitting + 14–18 weeks construction = 5–6 months total.
Permit required | Above-garage new ADU (full kitchen + separate entrance) | Design review comments possible but non-binding | Sub-meter required ($700–$1,200) | Electrical sub-panel required (new service) | Separate water meter required | Fire-flow test routine (usually pass) | Permit fees $1,500–$2,500 | Utility sub-meter + panel $800–$1,500 | Build cost $75,000–$90,000 | Timeline 6–10 weeks permitting + 14–18 weeks construction

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

California ADU State Law vs. Porterville Local Code: What Preempts What

California Government Code 65852.2 (and subsequent amendments AB 68, AB 881, SB 9, and AB 670) fundamentally rewrote how local governments like Porterville regulate ADUs. The state law is not optional — it preempts Porterville's local zoning, design review, parking, lot-coverage, and setback requirements if your project meets state thresholds. Specifically: Porterville cannot deny you an ADU on a single-family residential lot if the ADU is ≤1,200 sq ft (or ≤50% of primary-home size, whichever is smaller), has its own full kitchen and bathroom, and is either a new detached building, a conversion of an existing garage or accessory structure, or a junior ADU (shared kitchen). Porterville cannot require owner-occupancy (either the primary home or ADU), cannot impose parking minimums (though if you provide parking, you must maintain it), and cannot apply discretionary design review that goes beyond objective 'fire and life safety' standards (for instance, the city could require a fire-rated garage wall if the ADU is above a garage, but cannot reject the design for architectural incompatibility). The city retains authority over building code compliance (CBC = California Building Code, which mirrors IBC), utility capacity (water, sewer, fire flow), environmental review (CEQA exemptions apply to most ADUs under SB 9), and septic-system approval (if applicable). Porterville also retains the ability to impose reasonable conditions — for instance, requiring you to dedicate utility easements or upgrade water mains — as long as those conditions are not disguised zoning denials.

In practice, Porterville's planning department processes ADU permits ministerially (like-it-or-not approval) with a 60-day decision timeline (per AB 671 and AB 881). The city publishes ADU application checklists and has trained staff who understand state preemption; this is a strength for applicants who fill out the checklist correctly. However, Porterville's utility infrastructure (water pressure, sewer capacity, septic availability) is the real constraint, not zoning. The City of Porterville sits on the San Joaquin Valley aquifer, which has been stressed by agricultural overdraft for decades; water-main sizes in older neighborhoods (central and south Porterville) are often undersized for new demand, and the city's growth-management policies prioritize infill over sprawl. This means that water-capacity letters are not pro forma — they are real showstoppers if your lot is on a water-main edge and the 500+ GPM fire-flow requirement triggers a main upgrade. Similarly, if you are on septic (unincorporated pockets or some fringe areas), the county will impose substantive design-review conditions on the new septic system. Porterville does not have a local ADU ordinance that exceeds state minimums (the city adopts state law directly, with utility-review overlays); this is ADU-friendly and means you don't face a second layer of local restrictions beyond state law.

One local nuance: Porterville's development impact fees for ADUs are applied, but state law caps their scope. AB 681 (effective 2021) prohibits local agencies from charging ADU impact fees greater than 50% of the fees charged for a primary dwelling, and the City of Porterville complies — your ADU impact fees will not exceed roughly $2,000–$3,000 (compared to $4,000–$6,000 for a primary home). Porterville does not charge separate 'ADU parking fees' or 'ADU traffic mitigation fees' (state law bars these for ADUs specifically). Property tax is NOT a permitting issue, but note that an ADU is a new structure and will trigger a county assessor value adjustment; consult your tax adviser if this affects your project economics.

Water, Fire Flow, and Septic in Porterville: The Hidden Permitting Timeline

The San Joaquin Valley's water stress is real, and it directly impacts ADU permitting in Porterville. The city's water system draws from a shared regional aquifer that has dropped 100+ feet in the past 50 years due to agricultural pumping; the state now monitors Porterville's water-service area under the Sustainable Groundwater Management Act (SGMA). This does not automatically block ADUs — the city is not under a building moratorium — but it means Public Works takes water-capacity letters seriously. When you apply for an ADU permit, Porterville requires a 'water-service availability letter' from Public Works confirming that the city's water main serving your lot can deliver water at adequate pressure and volume. This involves a site-specific analysis: What size is the water main? What other homes/businesses are connected? What is the peak-day demand? Is the lot within 500 feet of a main, or do you need a new lateral (expensive)? If the main is undersized (a common finding in pre-1980 neighborhoods in south and central Porterville), Public Works will require a water-main upgrade — the city coordinates the work with a contractor and bills the property owner. These upgrades run $5,000–$15,000 and can take 6–10 weeks to schedule and execute. Plan for this possibility: request your water-capacity letter in Week 1 of your project, before submitting the full ADU application. If an upgrade is needed, negotiate the timeline with Public Works (can you proceed with permitting while the upgrade is designed? when will it be built?). Some projects have been delayed 8–12 weeks waiting for main upgrades; early coordination saves time.

Fire flow (the volume and pressure of water available for fire suppression) is checked by the Porterville Fire Department as part of the building-permit review. The code standard is 500 GPM at 20 PSI, sustained for 2–3 hours. In newer subdivisions (north Porterville), this is routine; in older neighborhoods, fire-main loops may not deliver this pressure at every lot. If fire flow is insufficient, the city can require a storage tank (underground cistern, $3,000–$6,000) or, in rare cases, a booster-pump station (expensive, usually shared). These are add-on costs to the project but are not showstoppers. Submit fire-flow letter requests with your water-capacity letter; Public Works and Fire can usually coordinate.

If your lot is on a septic system (a possibility in Porterville's unincorporated fringe or specific historic subdivisions), the timeline extends significantly. Tulare County Health & Human Services (HHSA) must review and approve septic-system design for the combined primary home + ADU load. A licensed septic designer will prepare soil percolation tests (perc tests), design a system to state Title 27 standards, and submit to county for approval — this typically takes 3–6 weeks. If the existing system is too small (likely, since it was sized for the original home only), you must install a new or expanded system, which costs $8,000–$15,000 and requires grading, permitting, and inspection. Septic approval must be in hand before Porterville issues the building permit for the ADU. Early coordination with county HHSA (call ahead in Week 1) can prevent surprises. County septic design standards are standardized and not negotiable; however, if your lot has space constraints (tight setbacks, easements), work with a designer early to find a feasible location.

Timeline impact summary: If you are on city water and sewer in a newer subdivision, expect 6–10 weeks of permitting (routine water/fire flow checks). If you are on city water in an older neighborhood with potential main-upgrade triggers, add 8–10 weeks for main design/construction. If you are on septic, add 3–6 weeks for county HHSA review, plus 4–8 weeks if a new system is required. Plan accordingly and budget accordingly; utility infrastructure is the primary permitting lever in Porterville, not zoning or design review.

City of Porterville Building Department
Porterville City Hall, 220 North Main Street, Porterville, CA 93257
Phone: (559) 782-7500 (main) — ask for Building and Planning Department | https://porterville.ca.us/ (search 'permit application' or contact building department for portal URL)
Monday–Friday, 8:00 AM – 5:00 PM (closed weekends and city holidays; check city website for holiday closures)

Common questions

Do I need owner-occupancy of the primary home or ADU in Porterville?

No. California AB 68 (effective 2019) eliminated owner-occupancy requirements for ADUs statewide, including in Porterville. You can rent out both the primary home and the ADU simultaneously, or live in one and rent the other. Porterville's local code does not override this state protection. Note: if your property is in unincorporated Tulare County (outside Porterville city limits), county rules may differ — confirm your jurisdiction.

Can Porterville require me to provide parking for an ADU?

No. California state law preempts parking requirements for ADUs. Porterville cannot impose a parking minimum for your ADU, even if the primary home is in an area with a general parking requirement. If you voluntarily provide a garage or carport, you must maintain it; but the city cannot condition ADU approval on parking or charge in-lieu parking fees.

What is a junior ADU (JADU), and how does it differ from a regular ADU?

A junior ADU (JADU) is a small ADU (up to 500 sq ft) within or partially within the existing primary dwelling, with a shared kitchen (the ADU has only a kitchenette or sink; a full kitchen is shared with the primary home via an interior door). JADUs are easier to permit and typically cheaper to build than detached ADUs because they reuse the primary home's foundation and utilities. Porterville allows JADUs and treats them as ADUs for state-law preemption purposes — no parking required, no owner-occupancy required, 60-day approval timeline applies.

How long does an ADU permit take in Porterville?

State law requires a decision within 60 days of a complete application (AB 671 and AB 881). However, the 60-day clock starts when your application is deemed 'complete' — missing utility letters or plan details can pause the clock. Realistic timeline: 6–10 weeks for permitting if utilities are straightforward (city water/sewer, adequate fire flow). Add 8–10 weeks if a water-main upgrade is needed, or 3–6 weeks if septic approval is required. Once you have a building permit, construction inspection takes 14–20 weeks (8–12 inspections, depending on complexity).

What happens if my lot is in a flood zone? Does that block my ADU?

No, but it adds requirements. If your lot is in a FEMA 100-year flood zone (check the FEMA Flood Map Service Center online), your ADU must be elevated or floodproofed per California Building Code Chapter 3 and local floodplain ordinance. This typically means raising the first-floor elevation above the base flood elevation (BFE) or dry-proofing the structure. A floodplain elevation certificate (surveyed by a licensed surveyor, $300–$600) is required before the building permit is issued. Floodplain design review adds 2–4 weeks but does not stop approval.

Can I build my ADU as an owner-builder in Porterville?

Yes, under California Business & Professions Code § 7044, owner-builders can pull permits and do construction work on their own residential property. However, electrical and plumbing work must be done by licensed contractors or by the owner if the owner holds an active electrical or plumbing license. All work is inspected by the city to the same code standard as contractor work. Building permits and fees are the same whether you are a licensed contractor or an owner-builder.

What is the difference between an above-garage ADU and a detached ADU in terms of permitting?

Both require permits and follow state ADU law. An above-garage ADU is built as a second story on an existing garage (conversion) or as new construction above a new garage. A detached ADU is a standalone structure on the lot. State law allows detached ADUs on any residential lot; there are no lot-size minimums (though small lots may hit setback challenges in practice). Above-garage ADUs are simpler because they reuse the garage foundation; detached ADUs require new foundation design per IRC R403. Both are subject to the same 1,200-sq-ft size cap and 60-day approval timeline.

Do I need a separate water meter and electrical panel for my ADU?

Separate utilities are not legally required by Porterville or California, but they are strongly recommended if you plan to rent out the ADU or want to track utility costs separately. A separate water meter costs $700–$1,200 and requires Public Works approval. A separate electrical sub-panel (fed from the main service panel) costs $500–$1,500 and allows you to submit separate utility applications and bills to tenants. If you share utilities with the primary home, the ADU and primary home are on the same meter/panel — this is allowed but complicates tenant billing and may trigger rental-contract disputes. Consult your electrician and lender before deciding.

Can I legally rent out my ADU in Porterville?

Yes, absolutely. State law allows ADU rental, and Porterville has no local restrictions on renting ADUs (the city does not impose rent caps or exclusive-use restrictions). ADU rents are capped by state law at 5% + CPI annual increases for the first 10 years if the property was deed-restricted, but most new ADUs are not deed-restricted. You are free to set initial rent and manage the lease as you would any rental property. Consult a real estate attorney for lease terms, and verify that your property-insurance and lender do not impose restrictions (some loan products disallow rental ADUs).

What is the earliest I can get a decision on my ADU permit application?

If your application is complete (site plan, floor plan, elevations, utility-capacity letters, property deed copy) and there are no red flags (water-main upgrade, septic redesign, flood-zone complication), Porterville's planning staff can issue a building permit in as few as 10–15 business days (2–3 weeks). However, the state law clock is 60 days from 'deemed complete,' not from submission — if staff request missing information, the clock pauses until you resubmit. To speed things up, submit a thorough application using the city's checklist (available on the permit portal or by calling the Building Department). Hire a designer familiar with Porterville ADU standards to avoid resubmittals.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current accessory dwelling unit (adu) permit requirements with the City of Porterville Building Department before starting your project.