Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
Tucson requires a permit for every ADU, including detached units, garage conversions, and attached units. Arizona has no state ADU preemption law like California, so local zoning rules still apply — but Tucson's 2023 ADU updates relaxed setbacks and eliminated some parking requirements.
Tucson stands out among Arizona cities because it adopted a comprehensive ADU ordinance update in 2023 that removed owner-occupancy mandates for principal dwellings and relaxed rear-setback requirements for detached ADUs from 15 feet to 5 feet in R-1 zones (single-family residential). This is a meaningful departure from Phoenix and other Maricopa County suburbs, which still impose stricter setbacks and owner-occupancy rules. The City of Tucson Building Department requires full building permits for all ADU types — no exemptions — but the department maintains a streamlined review path for ADUs under 750 square feet that meet pre-approved design standards, which can cut plan-review time to 3-4 weeks rather than the standard 8-12. You'll need to file through Tucson's online permit portal (ePermitting system) or in-person at 7575 E. Speedway Boulevard. The key local surprise: Tucson does NOT require separate utility meters for ADUs if you're willing to combine them on one service and apportion costs; many Arizona cities and HOAs demand separate services, so this flexibility is rare. Verify current ordinance language at the city's Development Services Division or request the 2023 ADU update memo directly — code moves fast in Tucson.

What happens if you skip the permit (and you needed one)

Tucson ADU permits — the key details

Tucson's 2023 ADU ordinance update (adopted to address housing shortages) eliminated the owner-occupancy requirement that previously mandated the primary homeowner live in either the main house or the ADU. This change matters: you can now own both units and rent them both out, or rent the ADU while living elsewhere — a flexibility that Phoenix, Scottsdale, and Flagstaff still restrict. The ordinance also relaxed setback minimums for detached ADUs in R-1 zones (15 feet rear setback reduced to 5 feet, side setback reduced from 10 feet to 5 feet if the ADU is under 750 square feet). ADUs over 750 square feet face tighter constraints (10-foot rear setback, 8-foot side), so size strategically. The city's development services staff confirm these rules in the Tucson Zoning Code Chapter 37, though the 2023 amendment language is sometimes only available via the city council meeting minutes or a direct request to the Planning Division. All ADUs — detached, garage conversion (often called a 'carriage house'), and attached ('junior ADU' or second unit on the same foundation) — require the same full building permit process. There is no exemption threshold by square footage.

The permit application process in Tucson runs through the City of Tucson Development Services ePermitting portal (https://development.tucsonaz.gov/ePermitting or similar; confirm the exact URL with the department). You'll upload architectural plans (site plan showing setbacks, floor plans, building sections, utility diagram), structural details (foundation design — critical in Tucson's caliche soil, which requires either pilings or removal/replacement), and a utility plan showing either separate meter connections or a cost-allocation agreement if you're combining on one service. The city's 'ePermit' system assigns a project number and a assigned plan-review team (you can usually request a pre-submittal meeting at no cost to discuss setback concerns or soil conditions before formal filing). Plan-review timelines: ADUs under 750 sq ft that use Tucson's pre-approved design standards (the city publishes a few on their development services website, though options are limited compared to California's state pre-approvals) can clear in 2-4 weeks; custom designs typically take 6-8 weeks for first submission, then 2-3 weeks for resubmittal after your corrections. Fees run $2,500–$6,000 for the permit itself (based on valuation, roughly 1-1.5% of construction cost), plus $200–$400 for site-plan review, plus utility connection fees if you're pulling separate meters (typically $500–$1,200 per meter from Tucson Water and Tucson Electric Power, depending on distance from existing service). Total soft costs (permit + review + utility deposits) often hit $4,000–$8,000 before construction starts.

Setback and lot-size traps are the most common plan-rejection reasons in Tucson. The city's 2023 amendments loosened rules, but the devil is in the detail: a detached ADU on a narrow infill lot (say, 40 feet wide) may violate side-setback rules if you're trying to maximize square footage. Tucson also maintains an 'Infill Overlay District' that applies in some older neighborhoods (Central, Dunbar Spring, Menlo Park); units in these zones may qualify for relaxed setbacks if the ADU is designed to match neighborhood character, but the approval requires a design-review permit in addition to the standard building permit (adds 2-3 weeks and $300–$500). If your lot is in a historic district or a flood-prone area near the Santa Cruz River or a wash, expect added scrutiny: the city requires a 'Qualified Flood Hazard Map' review (Free from FEMA; Tucson Planning usually does the assessment), and if your ADU footprint lands in the floodway, you'll need a 'Floodplain Development Permit' (separate application, $150–$300, and a 4-6 week hold while the city coordinates with county flood control). Caliche soil is ubiquitous in Tucson; if your soil test shows high caliche density within 2 feet of surface, the city's structural engineer may require deep-pile or helical-pier foundations rather than standard post-tension slabs, which can add $3,000–$8,000 to construction but is not a permit blocker — just a cost surprise. The city doesn't require fire-sprinklers for ADUs under 5,000 sq ft (state exemption), so that's one cost saved versus California.

Utility connections and sub-metering rules differ sharply from other Arizona cities. Tucson's 2023 update permits ADUs to share a water and electric meter with the primary house, as long as you file a 'Utility Sharing Agreement' and document how costs will be split (useful if you're renting to a family member or if cost-allocation simplifies your tax accounting). Most ADU owners in Tucson choose to split the service anyway — not because the city mandates it, but because renting tenants expect a separate bill. Separate meter installations cost roughly $500–$800 from Tucson Water (domestic supply) and $300–$600 from TEP (electric service), but there's often a 2-4 week delay as the utilities schedule the install. Sewer service is almost always on the same lateral as the primary house (no separate sewer meter available), so your ADU tenant will not have an independent sewer bill — the primary property owner covers sewer for both units. Gas (if applicable) can also be sub-metered relatively easily; contact Southwest Gas for a quote. The city requires that utility plans be stamped by a licensed mechanical engineer if you're doing custom sub-metering; this adds $300–$500 to design fees. One Tucson-specific note: the city's wastewater department sometimes requires a 'capacity analysis' if the lot's total water demand (primary house + ADU) exceeds the original lot's historical use; this happens mainly with large ADUs (over 800 sq ft) or older houses with low baseline usage. The analysis costs $200–$400 and typically clears in 1-2 weeks; wastewater rarely denies on capacity grounds for residential ADUs, but the analysis can trigger a minor design change (e.g., a smaller water heater or fixtures downgraded to low-flow).

Next steps after permit approval: once the city stamps your permit (usually via email in the ePermitting system), you can schedule the first inspections. Tucson's inspection sequence for ADUs is: (1) foundation/footing inspection (usually within 3 days of request, required before pouring concrete if the ADU has a new slab); (2) framing inspection (after walls and roof are up); (3) rough electrical, plumbing, HVAC inspection (before drywall); (4) insulation and drywall inspection; (5) final building inspection (after trim, flooring, paint); (6) electrical final (Tucson Electric Power inspector, scheduled separately); (7) plumbing final (Tucson Water, also separate scheduling). Each inspection requires 24-48 hours notice to the city; inspectors typically respond within 2-3 business days. Plan 3-4 months from permit approval to final approval if you're working with a general contractor; owner-builders can apply (Arizona allows unlicensed owner-builders for their own residence, so an ADU on your primary property qualifies) but must schedule all inspections themselves and may face closer scrutiny on electrical/plumbing (the city often requires a licensed electrician/plumber to pull permits and sign off even if the owner does the work). Final approval comes only after all inspections pass and the city's Planning Division signs off that the unit meets ADU ordinance requirements (occupancy certificate issued). The entire timeline from permit approval to certificate of occupancy is typically 12-16 weeks with a contractor, 16-20 weeks for owner-builders.

Three Tucson accessory dwelling unit (adu) scenarios

Scenario A
600 sq ft detached ADU (new construction), corner lot in South Tucson, 8-foot side setback, 5-foot rear setback, separate electric meter, no kitchen (junior ADU)
You own a 50-foot-wide lot in South Tucson (zoned R-1, outside historic district, not in floodplain) and want to build a detached 600 sq ft accessory dwelling unit with one bedroom, a full bathroom, living area, kitchenette (no full kitchen — no stove, only a microwave and sink), and a separate entrance. Because this is a 'junior ADU' (no full kitchen), some Arizona cities treat it more leniently, but Tucson classifies it as a full ADU for permit purposes. The 8-foot side setback and 5-foot rear setback comply with Tucson's 2023 relaxed requirements for units under 750 sq ft. Your lot is 50 feet wide, so placing the ADU 8 feet from one side and positioning the primary house on the other side is feasible. You'll need a full building permit: submit site plans, foundation design (Tucson's caliche survey is recommended, roughly $300–$500 and 1-2 weeks for geotechnical report), floor plans, electrical/mechanical/plumbing diagrams, and a utility plan showing a separate electric meter (separate water meter is optional per Tucson rules, but you're choosing to split it for tenant clarity). The city's plan review (standard track, not pre-approved) will take 6-8 weeks for first submission. Expect one or two requests for clarification on setback dimensions or foundation details. Permit fee is roughly $2,800 (based on estimated construction cost of $180,000–$200,000 at 1.5% permit rate). Add $700 for separate electric meter install (TEP will schedule after permit approval, 2-3 weeks). Total permit soft costs: $4,000–$4,500 before breaking ground. Construction timeline: 4-5 months once foundation is poured (foundation inspection, framing, mechanicals, drywall, final inspections, certificate of occupancy). No parking requirement applies to ADUs under Tucson's 2023 rules, so you don't need a dedicated parking space.
Permit required | $2,800 permit fee | $700 separate electric meter | $300–$500 soil test (caliche) | Tucson relaxed setback rules apply | No owner-occupancy requirement | No parking requirement | 6-8 week plan review | 4-5 month construction
Scenario B
900 sq ft garage conversion (ADU above/integrated into existing garage), attached to primary house, Infill Overlay District (Dunbar Spring neighborhood), historic-district design review required, shared utility meter with main house
You have a 1950s bungalow in the Dunbar Spring neighborhood (Infill Overlay District) with an existing detached garage (22 feet by 18 feet, roughly 400 sq ft). You want to convert it into a 900 sq ft two-story ADU: remove the garage doors, add a second story, install a kitchenette and full bathroom downstairs, a bedroom and secondary bathroom upstairs, and a separate entrance on the side. Tucson's 2023 ADU rules allow garage conversions without owner-occupancy restrictions. However, because Dunbar Spring is in an Infill Overlay District AND a locally designated historic district, you'll need two permits: (1) a Design Review Permit (architectural review, $300–$500, 3-4 week timeline, ensures the ADU fits neighborhood character — the city will want the exterior to echo 1950s Craftsman details or similar); and (2) a full building permit for the conversion (roughly $3,200–$3,800, plan review 8-10 weeks because the overlay adds scrutiny). The Design Review Permit must clear before the building permit review begins, so expect a 2-3 week sequential delay. Your site plan must show that the new two-story structure respects the neighborhood's setback patterns and doesn't tower above neighboring houses (height limit in historic areas is often 35 feet, and your 900 sq ft two-story is probably 24-26 feet — acceptable). Because the lot is infill (typically smaller, older), setbacks may be tighter than the new 5-8 foot minimums; the Design Review committee will approve any variance needed if the ADU fits the block's character. Utility plan: you're sharing one meter with the primary house (permitted under Tucson's 2023 rules), but you'll file a 'Utility Sharing Agreement' to document how costs are split; this doesn't require a licensed engineer stamp, just a simple notarized agreement ($30–$50 to have notarized). No separate meter install costs. However, the shared meter may limit your ability to separately bill a tenant; if you plan to rent, clarify with TEP how to allocate usage (some tenants accept a 'utility included' arrangement; others demand separate bills). Total permit and design-review costs: $4,000–$5,200. Inspection sequence adds 1-2 weeks because the city's historic-preservation staff may attend the framing inspection to verify interior finishes (plaster profile, window restoration, etc.). Construction timeline: 5-7 months (foundation work on converted garage is minimal; main effort is the second-story build, mechanical rough-ins, and finishing). Caliche is likely under the existing garage, so your contractor should excavate a small test pit during the Design Review phase to confirm soil conditions — adds $200–$300 and 1 week.
Permit required (building + design review) | $3,200–$3,800 building permit | $300–$500 design review | $200–$300 soil test | $30–$50 utility sharing agreement | Infill Overlay overlay adds 2-3 week delay | Historic district compliance mandatory | Shared meter permitted (no install cost) | 8-10 week plan review
Scenario C
750 sq ft attached ADU ('second unit' on same foundation as primary house), new primary residence in Foothills North (zone R-1, no overlays, caliche/rocky soil), separate electric and water meters, potential floodplain proximity
You're building a new 2,500 sq ft primary residence in Foothills North (north of Sabino Canyon, hillside area) and want to include a 750 sq ft attached ADU (same foundation, shared wall, separate entrance) with one bedroom, one bathroom, and a full kitchen. This is a 'second unit' rather than a detached ADU, so it's part of a duplex-style layout on a single footprint. Tucson's 2023 rules treat attached ADUs (same setback relief as detached, 5-10 foot rear setback depending on size). The Foothills North area has rocky, caliche-heavy soil (elevation ~2,800 feet), so your soils engineer will recommend helical piers or deep-pile foundations rather than a standard post-tension slab; this isn't a permit blocker but adds $4,000–$8,000 to construction. The area also sits near washes that can flood during monsoon season; Tucson's Planning Division will require a 'Qualified Flood Hazard Map' determination. The property may or may not be in the 100-year floodplain (FEMA mapping is coarse in rural foothills). If you are in the floodplain, the city requires a 'Floodplain Development Permit' ($150–$300, 4-6 week hold while Pima County Flood Control reviews) and potentially elevated first-floor elevation above the base-flood elevation — adds design complexity and cost. Assuming you're NOT in the floodplain (most Foothills lots are outside the mapped zones), your timeline is: (1) Full building permit application for the whole structure (primary + ADU), $4,200–$5,000 (1.5% of estimated $280,000–$333,000 total construction cost). Plan review: 8-10 weeks (standard, no overlay overlay complexity like Scenario B, but soils and foundation details slow the review). (2) Separate electric meter ($600–$800) and separate water meter ($500–$700) for the ADU, scheduled post-permit, 2-3 weeks for utility installs. (3) Sewer is shared lateral (no separate sewer meter). Total soft costs: $5,500–$7,500. One caution: because the Foothills North area is in Arizona Water Company's service territory (not Tucson Water directly), utility connection procedures and meter-install timelines differ — confirm with Arizona Water Company during the permit phase. Inspection sequence: because both units are under one roof, the city treats this as a single-family duplex and requires the same inspection cadence (foundation, framing, rough trades, insulation, drywall, final) for both units simultaneously. No owner-occupancy requirement applies, so you can rent both units if desired. Construction timeline: 6-8 months from permit approval (helical-pier foundation adds 2-3 weeks for install and inspection; mountain location may add weather delays in winter).
Permit required (primary + ADU combined) | $4,200–$5,000 permit fee | $600–$800 electric meter | $500–$700 water meter | $500–$1,200 soil test (foothills caliche/rock) | $4,000–$8,000 helical-pier foundation (not permit cost, construction cost) | Floodplain check required ($0 if outside floodplain, $150–$300 permit if inside) | 8-10 week plan review | 6-8 month construction

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

Tucson's caliche soil and ADU foundation design: why it matters and what to budget

Caliche (calcrete, a layer of calcium carbonate cement) is nearly universal in Tucson soils, especially in the basins and valleys where most residential development occurs. The Foothills areas above 2,500 feet elevation tend to have rockier, less caliche-rich soils, but even north-of-downtown neighborhoods like Infill or central Tucson sit on 2-4 feet of caliche overly lies deeper clay. The city's building code (which adopts the 2021 IBC with Tucson amendments) requires a soils report (technically a 'subsurface investigation report') for all new residential structures, including ADUs, if the lot hasn't been tested in the past 5 years. The soils report costs $300–$600 for a residential-lot test (two or three test pits, lab analysis, geotechnical engineer's stamp) and takes 1-2 weeks to complete.

The caliche layer, if present within 2 feet of surface and more than 3 inches thick, typically requires removal and replacement with compacted fill, or alternatively, a deep-foundation system (helical piers, drilled piers, or post-tensioned slabs designed specifically for caliche conditions). Standard slab-on-grade (what many homeowners assume they'll use) is NOT recommended if caliche is present because differential settlement and heave can crack the foundation and walls. Most ADU builders in Tucson budget for either: (1) removal-and-replacement (excavate caliche, replace with 4-6 inches of gravel, compact, then pour slab) — cost roughly $2,000–$4,000 depending on caliche thickness and lot size; or (2) helical-pier system (steel screws twisted into ground below caliche, support beams and grade beam above, then slab or post-tensioned design) — cost $4,000–$8,000 for a 600-750 sq ft ADU. The city's plan-review team will flag this issue early if your soils report shows caliche; they'll request a revised foundation design before permit approval. You cannot pour until the city's soils engineer (or your engineer, if they're qualified) signs off on the foundation plan. No amount of permit money accelerates the soils-testing timeline, so plan for a 2-3 week slip from 'permit application' to 'actual groundbreaking' because the soils report and foundation redesign must happen first.

One Tucson advantage: the city's Development Services staff are generally knowledgeable about caliche and don't penalize you for it. Some Arizona suburbs (Chandler, Gilbert in Maricopa County) treat caliche issues as a 'project risk' and slow-roll the review, essentially pressuring you to use a premium deep-foundation system. Tucson's reviewers accept either removal-and-replacement or deep piers as equally compliant, so you can choose based on cost and timeline. If you're using an owner-builder approach (Arizona allows it), hire a geotechnical engineer directly ($1,500–$2,500 for a comprehensive site assessment and foundation-design consultation) before applying for the permit; this upfront cost often saves 2-3 weeks of back-and-forth during plan review because your foundation design will already address the city's most common caliche question.

Tucson's 2023 ADU ordinance update: what changed, and how it affects your project timeline and costs

Tucson adopted a comprehensive ADU-friendly ordinance update in 2023, aligned with state ADU-promotion trends (though Arizona, unlike California, has no statewide ADU preemption law). The three biggest changes: (1) elimination of the owner-occupancy requirement (previously, the property owner had to live in either the primary house or the ADU; no longer); (2) relaxed setbacks for detached ADUs under 750 sq ft (rear setback dropped from 15 feet to 5 feet, side setback from 10 feet to 5 feet); and (3) elimination of a mandatory off-street parking space for the ADU (previously required, now optional city-by-city). These changes reduce design constraints and construction costs for many ADU projects; a 50-foot-wide infill lot that would have been too narrow for an old-code ADU might now fit a 600 sq ft detached unit comfortably.

The city's permitting timeline, however, hasn't dramatically shortened. Because Arizona has no state ADU pre-approval system like California's SB 9 (which allows 'ministerial' approval without local discretion), Tucson's plan review still requires full architectural and structural review, just like a standard addition or new house. The city does maintain a fast-track option for ADUs under 750 sq ft that use Tucson's published 'pre-approved ADU designs' (usually 1-2 generic floor plans available on the city's development website), but most owner-builders customize the design, which triggers the standard 6-8 week review. Request a pre-submittal meeting (free, scheduled via the ePermitting portal) to confirm that your ADU design will clear setback and coverage checks before formal submission. This 30-minute call often prevents 1-2 rounds of rejection and resubmittal.

The cost impact of the 2023 update is modest: you save money on parking requirements (no need to pour a dedicated driveway section for ADU parking), but permit fees are unchanged (1-1.5% of valuation), and plan-review fees are the same. The owner-occupancy elimination is a financing advantage — some lenders now treat ADU construction as an investment property rather than a single-family residence, which can affect loan rates and down-payment requirements, but the permit process itself is identical. If you're planning a rental ADU, confirm with your lender early that the 'no owner-occupancy' rule means they'll approve the loan; some out-of-state lenders still aren't familiar with Tucson's 2023 update and may lag in underwriting.

City of Tucson Development Services Division
7575 E. Speedway Boulevard, Tucson, AZ 85710
Phone: (520) 837-7500 (main line; ask for Building Permits or ePermitting support) | https://development.tucsonaz.gov/ePermitting (or confirm via city website; link may vary)
Monday–Friday, 8:00 AM–5:00 PM (closed city holidays; phone lines may experience delays during high-volume periods; ePermitting portal accessible 24/7 for submissions)

Common questions

Does Arizona law preempt Tucson's ADU rules, like California's SB 9?

No. Arizona has no statewide ADU preemption law. SB 1491 (passed 2022) encourages ADUs and bars cities from charging ADU permit fees higher than single-family home fees, but it does not override local zoning or setback rules. Tucson's local ordinance governs your project. The state does allow owner-builders (ARS § 32-1121) to build their own ADU without a license, but the ADU still requires a local permit and full inspection.

Can I build an ADU without the primary house owner living on-site?

Yes, as of Tucson's 2023 update. Previously, the property owner had to occupy either the primary house or the ADU. Now, you can rent both units to tenants, or live off-site and rent both. This change makes ADU investing much more feasible in Tucson.

Do I need a separate water meter and electric meter for the ADU?

Not by law, per Tucson's 2023 rules — you can share one meter with the primary house and file a 'Utility Sharing Agreement' to document cost splits. However, if you're renting the ADU, most tenants expect separate metering so they can control their own utility bills. Separate meter installation costs $500–$800 per utility (water, electric) and takes 2-3 weeks to schedule with the utility company after permit approval.

What's the difference between a 'junior ADU' and a full ADU in Tucson?

A junior ADU lacks a full kitchen (no stove, only a microwave and sink; no oven). Some Arizona cities treat junior ADUs more leniently (smaller setbacks, lower fees). Tucson classifies both junior and full ADUs identically for permit purposes — same permit fee, same inspection sequence, same setback requirements. The lack of a stove doesn't reduce your permitting burden.

How long does the entire process take from permit application to certificate of occupancy?

Plan 12-16 weeks if you're using a general contractor (6-8 weeks plan review, 4-5 months construction, plus 2-3 weeks for final inspections and paperwork). Owner-builders often add 3-4 weeks because they schedule inspections individually and the city may request site visits to verify owner-builder compliance. Soil testing or Design Review requirements (e.g., historic district) can add 2-3 weeks to the front end.

Will I need a Floodplain Development Permit in addition to the building permit?

Only if your lot is in Tucson's mapped 100-year floodplain (or close to a major wash flagged by Pima County Flood Control). Foothills and higher-elevation lots are rarely in the floodplain. Request a free 'Flood Hazard Map' review from Tucson Planning (usually 3-5 business days) early in your design phase. If you ARE in the floodplain, the Floodplain Development Permit ($150–$300) adds 4-6 weeks and may require elevated first-floor elevations, which increases construction costs.

Do I need an HOA approval before applying for the permit?

Yes, if your property is in an HOA. Check your CC&Rs (Covenants, Conditions, and Restrictions) to see if they allow ADUs or limit lot coverage/height. Some older Tucson HOAs prohibit ADUs outright or require board approval. Obtain HOA sign-off BEFORE submitting the permit application to avoid a rejection after months of plan review. This is not a city requirement, but an HOA covenant violation can prevent you from legally occupying the ADU even after the city approves the permit.

What happens to property taxes when I add an ADU in Tucson?

Arizona assessors may increase your property's assessed value once the ADU is completed and on record (the county assessor's office is notified after the city issues a Certificate of Occupancy). The increase depends on your ADU's square footage, finishes, and local comparable-property values; expect a 10-30% increase in your property's assessed value, which translates to a roughly proportional increase in annual property taxes. Consult a tax assessor or real estate agent for an estimate before construction. This is NOT a permit cost, but a long-term tax impact you should budget for.

Can I get a fast-track or 'over-the-counter' permit approval in Tucson?

Potentially, if your ADU is under 750 square feet and matches one of Tucson's published pre-approved design standards. The city doesn't publish an extensive pre-approved library like California, but a handful of generic designs are available on the development services website. Most custom ADU designs go through the standard 6-8 week plan review. Request a pre-submittal meeting (free, via ePermitting) before formal submission to confirm your design will qualify for any expedited track; this often reveals conflicts early and prevents rejections.

What if I want to convert a shed or existing small building into an ADU instead of building new?

The permit requirements are the same: you'll need a full building permit, plan review, and inspections (foundation, framing, mechanicals, final). Conversion projects often take LONGER than new construction because the city must verify that existing foundations, framing, and utilities are code-compliant. If the shed is on a concrete pad without footings, the city will require foundation work. If the shed has outdated wiring or plumbing, those systems must be upgraded to current code. Budget 8-12 weeks for plan review and 3-4 months for construction, assuming the shed's bones are reusable; some conversions are cheaper to demolish and rebuild.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current accessory dwelling unit (adu) permit requirements with the City of Tucson Building Department before starting your project.