How City of Memphis takes applications: online, on its online permit portal (aca-prod.accela.com).
We can file it for you, $125: we fill in City of Memphis's application for fence, driveway, HVAC and electrical permits on the portal, submit it and answer the town's questions about it. The town's filing fee due at submission is included up to $75. If we can't submit your application, you get your money back. (Permit expediters typically charge $350 or more for the same paperwork.) How filing works
★★★★★ 4.8 from 6 customer reviews: “In a world of ever-increasing slop, it's nice to have a tool that cuts through all the low-quality sites, promoted on regular search engines, to get to the actual government forms.” (Kollin P.) “I got exactly what I needed in less than a minute, hassle free and painless” (Michael W.) All reviews
Prefer to file it yourself? The $24.99 Filing Kit gives you the answer for your address, what City of Memphis needs from you and step-by-step instructions. Check my City of Memphis address →
Do I need a permit in Memphis, Tennessee?
Memphis has two climate zones (4A west, 3A east) and shallow 18-inch frost depth that sets it apart from colder regions. The City of Memphis Building Department administers permits under the 2015 International Building Code with Tennessee amendments. Most residential projects — additions, decks, fences, electrical work, HVAC — require a permit. Owner-builders can pull permits on owner-occupied properties, but you'll need to meet the same inspections and code standards as a licensed contractor. The good news: Memphis is relatively straightforward if you know the thresholds. The bad news: many homeowners skip permits on small projects and get caught during a sale or insurance claim. The safest move is a quick call to the Building Department before you start. Frost heave is minimal here compared to northern states, but the Shelby County soil (karst limestone, alluvium, and expansive clay in some pockets) means footing depth still matters — especially if you're building near a creek or in areas with subsidence risk. Keep that 18-inch minimum in mind for decks and sheds.
What's specific to Memphis permits
Memphis adopted the 2015 International Building Code, which is the standard for most major Tennessee cities. This means code references you find online — IRC sections, NEC articles, IBC thresholds — apply directly in Memphis. The city does not have a separate 'Memphis building code' with radically different rules; the Building Department enforces the IBC as adopted by Tennessee and applies local amendments where they exist. This is good: it keeps the code predictable.
The shallow 18-inch frost depth affects deck and shed footings. IRC R403.1 requires footings to extend below the frost line. In Memphis, that means footings must go at least 18 inches deep. Many homeowners dig 12 inches and assume they're okay; they're not. The frost heave season is shorter here than in the North, but a footing that doesn't reach grade will shift, and shifted footings fail inspections and create liability. Post-and-beam decks, small sheds, even mailbox posts — all subject to this rule if they're permanent structures.
Memphis's soil composition varies by neighborhood. West Memphis and areas near the bluff have more karst limestone; central and south Memphis tend toward alluvium and expansive clay. Expansive clay is problematic because it swells when wet and shrinks when dry, causing differential settlement. If you're building a foundation, deck, or retaining wall in an area with expansive soil, the inspector may require soil testing or a geotechnical report. It doesn't always stop the project, but it changes the scope and cost. This is not a Memphis-specific code item — it's best practice — but it's worth knowing because Shelby County has pockets of it.
The City of Memphis Building Department processes permits at City Hall. As of this writing, the department offers an online portal for permit applications and status checks; search 'Memphis TN building permit portal' to confirm the current URL and login requirements. Over-the-counter permits (simple fence permits, certain repair permits) can sometimes be approved same-day if you have all required documents. Plan-review permits for additions, pools, and electrical work take 7-14 days on average. Resubmittals after a rejection can add 7-14 days. Budget 3-4 weeks if you're not in a rush and you file a complete application.
One quirk: Memphis requires a state-issued electrical permit for any electrical work that ties into the existing service or adds new circuits. You can pull a permit as an owner-builder, but if the work is beyond very basic scope, you'll benefit from a licensed electrician. The same goes for HVAC work and plumbing — owner-builders are allowed, but the inspector will be stricter on code compliance if you don't have a license. Gas-line work almost always requires a licensed contractor and a separate gas permit. Don't assume you can DIY all trades; the Building Department publishes a scope-of-work guide — call and ask.
Most common Memphis permit projects
These are the projects that land on the Building Department's desk most often. Each has its own threshold, fee, and timeline. Click through for the specifics — the difference between a $75 fence permit and a $500+ addition permit is usually just one or two measurements.
Decks
Any deck 30 inches or more above ground requires a permit in Memphis. Single-story attached decks, elevated detached decks, multi-level decks all need one. The 18-inch frost depth means you'll file footing details; expect plan review plus footing inspection.
Fences
Fences 6 feet tall in rear yards, 4 feet in front/side yards require permits in most Memphis zoning districts. Corner lots and commercial-adjacent properties have stricter sight-triangle rules. Pool barriers always require a permit regardless of height.
Electrical work
New circuits, service upgrades, subpanels, and dedicated equipment lines require electrical permits in Memphis. Homeowner can pull the permit, but expect a state-licensed electrician to file if the work ties into main service. Expect 1-2 week plan review plus rough and final inspections.
HVAC
New air-conditioning units, furnaces, heat pumps, and ductwork require permits. Simple replacement of like-for-like equipment sometimes exempt, but new installation or change of equipment type always needs a permit. Budget $150–$300 in fees.
Room additions
Any addition to the main house — bedrooms, living space, bathrooms — requires a full permit with plan review, foundation inspection, framing inspection, final electrical, and final inspection. Budget 4-6 weeks and expect fees in the $300–$800 range depending on square footage and complexity.
Memphis Building Department contact
City of Memphis Building Department
Monday–Friday, 8 AM–5 PM
For the phone number and current details, see the city's official website.
Tennessee context for Memphis permits
Tennessee statutes allow owner-builders to pull residential permits on owner-occupied property. You do not need a general contractor's license. However, you must meet all code requirements, pass inspections, and carry the same liability as a licensed contractor. Tennessee adopted the 2015 International Building Code statewide, so the code basis is consistent across the state — Memphis is not an outlier. The state also recognizes electrical, plumbing, HVAC, and gas licensing; these trades are regulated at the state level, which means a licensed contractor from Nashville or Knoxville can pull permits in Memphis and vice versa. If you're hiring a contractor, verify they hold a valid Tennessee license. For gas work, you'll almost always need a state-licensed gas fitter; homeowner gas work is very restricted. Tennessee has no statewide property tax assessment penalty for unpermitted work, but unpermitted work can void insurance claims and complicate a future sale — most title companies require a permit history or a variance letter before closing. The risk is not a fine; it's liability and loss of coverage.
Common questions
Do I really need a permit for a small deck or shed?
Yes, if it's permanent. In Memphis, any deck 30 inches or higher above ground and any shed over 120 square feet require a permit. The threshold is not about cost or visibility; it's about structural safety and footing depth. The 18-inch frost depth means improper footings will shift over time. A permit ensures the inspector checks your footings and framing. Most homeowners who skip this step get caught during a sale or insurance claim. It's not worth the risk. Call the Building Department and ask; a routine deck or shed permit is $75–$200.
Can I do electrical work myself in Memphis?
Yes, as an owner-builder on owner-occupied property. You pull the permit, you do the work, you pass the inspection. But here's the catch: the inspector will be thorough because you don't hold a license. Every wire, junction box, breaker, and grounding detail must match the NEC (National Electrical Code). If you've never done this, it's a recipe for rejections. Many homeowners hire a licensed electrician to do the work or at least to sign off on the permit and rough-in. It costs more up front but saves rejections and stress. Service upgrades and subpanel work are especially strict — don't DIY those unless you have real experience.
How deep do footings need to be in Memphis?
At least 18 inches below finished grade. This is the IRC minimum for Memphis's frost line. Many people confuse 'frost depth' with 'ground freezes this deep' — frost heave here is less severe than in the North, but frost still moves soil, and a footing that stops at 12 inches will shift. The Building Department inspector will check footing depth during the foundation/footing inspection. Don't guess; measure from grade down 18 inches, mark it on your plan, and dig to that depth. For sheds on blocks or piers, each pier goes down 18 inches.
What if I build without a permit and then try to sell my house?
Most title companies and lenders will require proof of permit and inspection before closing. If you don't have it, you have three options: hire a contractor to pull a retroactive permit and pass inspection (expensive and not guaranteed), get a letter of variance from the Building Department (rare and limited), or ask the new owner to agree to assume the liability (unlikely). Many deals die at this stage. Unpermitted work also voids insurance coverage for that area of the house — if an electrical fire or collapse happens in unpermitted space, the insurer can deny the claim. It's not a criminal fine, but it's a civil and financial nightmare. Spend the $150–$300 on a permit now.
How long does plan review take in Memphis?
Routine projects (decks, small sheds, simple additions) average 7–14 days. Complex projects (multi-story additions, electrical service upgrades, custom framing) can take 14–21 days. If the reviewer finds something wrong, you resubmit, and the clock starts over — plan for another 7 days. Over-the-counter permits (simple fences, some repairs) can be approved same-day if you show up with a complete application. If you need a permit fast, ask the Building Department which projects qualify for over-the-counter review and file accordingly. Filing online usually doesn't speed things up — it just lets you upload documents instead of printing copies.
Do I need a permit to replace my air-conditioner or furnace?
It depends. Replacing an air conditioner or furnace with the same type and size, in the same location, with the same ductwork and electrical connection, is often exempt. But the inspector has discretion, and you're safer filing a permit. New equipment, change of location, new ductwork, or a change of equipment type (e.g., gas furnace to heat pump) always requires a permit. HVAC permits are quick — usually $150–$300 — and the review is fast because the scope is narrow. Call the Building Department, describe your project, and ask if you need a permit. The answer is almost always yes.
What if I'm not sure whether my project needs a permit?
Call the City of Memphis Building Department and describe the work. Have measurements, a sketch, and a clear list of what you're doing. The staff can usually tell you within 10 minutes whether a permit is required and what the fee will be. If they can't give you a clear answer, ask for a written determination from the plan reviewer. This costs a bit ($50–$100) but it covers you if you're working in a gray zone. Don't guess and hope. Permitting is not optional if the code requires it, and guessing wrong is expensive.
What about soil and foundation issues in Memphis?
Memphis has pockets of expansive clay, especially in central and south Memphis. Expansive clay swells when wet and shrinks when dry, causing differential settlement and foundation cracks. If you're pouring a new foundation, building a retaining wall, or installing pilings, the inspector may require soil testing or a geotechnical report. This is not a Memphis-specific rule — it's best practice in areas with problem soil — but it's worth knowing because Shelby County has areas prone to it. If you're in a neighborhood with visible foundation cracks or have a contractor mention 'clay,' get a soil report before you start. It's $300–$800 for testing and advice, and it saves thousands in repairs later.
Ready to file your Memphis permit?
Start with a call to the City of Memphis Building Department. Have your project description, lot dimensions, and a sketch or photo ready. The staff can confirm whether you need a permit, give you a fee estimate, and tell you what documents to bring or upload. Most permits are routine. The ones that get stuck are the ones filed incompletely. A 10-minute phone call before you file saves weeks of back-and-forth. If you're hiring a contractor, verify their license through the Tennessee state contractor board. If you're owner-building, understand that the inspector will check your work closely — code compliance is non-negotiable. File early. Build right. Pass inspection. Sell or insure without stress.
More Tennessee towns
Towns near Memphis in the alphabet where we file your permit for you: Lawrenceburg, Lenoir City, Lincoln County, Madisonville, Portland, Pulaski, Selmer, Shelby County / Develop901.