Shed, fence, pool and carport permits in Salt Lake City, UT

Filing in Salt Lake City, UT · updated October 27, 2026

How Salt Lake City takes applications: online, on its online permit portal (aca-prod.accela.com).

We can file it for you, $125: we fill in Salt Lake City's application for shed, gazebo or pergola, carport, above-ground pool or hot tub, shed or garage demolition, fence and driveway permits on the portal, submit it and answer the town's questions about it. The town's filing fee due at submission is included up to $75. If we can't submit your application, you get your money back. (Permit expediters typically charge $350 or more for the same paperwork.) How filing works

★★★★★ 4.8 from 6 customer reviews: “In a world of ever-increasing slop, it's nice to have a tool that cuts through all the low-quality sites, promoted on regular search engines, to get to the actual government forms.” (Kollin P.) “I got exactly what I needed in less than a minute, hassle free and painless” (Michael W.) All reviews

Prefer to file it yourself? The $24.99 Filing Kit gives you the answer for your address, what Salt Lake City needs from you and step-by-step instructions. Check my Salt Lake City address →

Do I need a permit in Salt Lake City, Utah?

Salt Lake City sits in one of the most seismically active zones in Utah, and the building code here reflects it. The City of Salt Lake City Building Department administers the 2021 International Building Code with Utah amendments, which means projects here carry some specific structural and seismic requirements you won't find in other cities. The Wasatch Fault runs directly beneath the city, so even modest additions and foundation work get scrutiny that other jurisdictions skip. Frost depth varies from 30 inches on the benches to 48 inches in mountain neighborhoods, and the region's Bonneville clay soils are expansive — they swell when wet and crack when dry. That matters for footings, drainage, and grading. The city allows owner-builders to pull permits for owner-occupied projects, but you'll still need a licensed contractor for electrical, plumbing, and mechanical work unless you hold those licenses yourself. Most projects go through the online permit portal or in-person at Salt Lake City Hall. Plan on 2-3 weeks for staff review on typical residential work, though over-the-counter permits (small sheds, fences, minor repairs) can sometimes be issued same-day.

What's specific to Salt Lake City permits

Seismic design is the biggest wildcard in Salt Lake City permits. The 2021 IBC with Utah amendments requires that decks, additions, and foundation work demonstrate seismic resistance — typically through connection details, anchor bolts, or engineer certification. A simple deck that would be exempt in Denver might need structural drawings here. Ask the building department upfront whether your project sits in a seismic-design category that triggers additional requirements; if it does, a structural engineer's stamp ($500–$2,000) often becomes a cost of entry.

Frost depth and clay soils create another layer. Most of Salt Lake City requires footings to go 36 inches minimum, but higher elevations and certain neighborhoods push that to 48 inches. More importantly, the clay soils are expansive — they can shift when they freeze and thaw. The building department may require a soil report for decks, additions, or any project involving fill or grading. A basic geotechnical investigation runs $800–$2,500; skipping it and getting caught mid-construction is far more expensive.

The City of Salt Lake City Building Department processes permits online through their portal (accessible via the city's main website, though the exact URL changes annually — call 801-535-7600 to confirm the current link). Over-the-counter permits for fences, sheds, and repairs can be expedited if you have all documentation ready; plan check staff can often review while you wait. Complex projects get routed to a full plan-check cycle, which averages 2-3 weeks. If the examiner finds a seismic or foundation issue, resubmittal can add another 7-10 days.

The city bundles electrical, plumbing, and mechanical into a single permit application, but you'll need separate licensed-contractor affidavits for each trade. If you're an owner-builder doing structural work yourself, you still cannot pull electrical or plumbing subpermits without a license. This trips up a lot of homeowners — plan on hiring licensed subs for those trades even if you're framing the addition yourself.

Salt Lake City fees run on a valuation basis. Most residential permits are calculated at roughly 1.5-2.5% of declared project valuation, plus per-unit mechanical and electrical fees ($30–$75 each). A $50,000 deck or addition will run $750–$1,250 in permit fees. The city also applies a 'State of Utah Construction Services Fund' surcharge on top, which adds 1-2% more. Bring a detailed cost estimate or contractor quote to speed the intake process — vague valuations trigger staff callbacks and delays.

Most common Salt Lake City permit projects

Salt Lake City homeowners hit the same permit questions year-round. Here are the projects that trigger the most calls to the building department, with the local context that shapes each one.

Salt Lake City Building Department contact

City of Salt Lake City Building Department
For the phone number and current details, see the city's official website.

Online permit portal →

Utah context for Salt Lake City permits

Utah adopted the 2021 International Building Code with state amendments effective in 2023. The state building code emphasizes seismic design (Utah is the second-most seismically active state after California), radon mitigation, and energy compliance. Salt Lake City sits in Seismic Design Category D, which is the highest category in the state — it's a big deal. The state also allows homeowners to perform structural work on owner-occupied properties without a contractor license, but electrical, plumbing, and HVAC work still require licensed subcontractors. Utah has no statewide permit reciprocity with neighboring states; each municipality enforces its own code. The state does not require a homeowner to use a licensed general contractor for residential work, but municipalities can set stricter rules. Salt Lake City is relatively permissive on owner-builders, but they still get the full code inspection cycle.

Common questions

Do I need a permit for a small shed in my backyard?

Sheds 200 square feet or smaller are often exempt in Salt Lake City if they're more than 5 feet from a property line and don't exceed height limits (usually 15 feet). Check with the building department on your lot's setback requirements; corner lots and lots near public rights-of-way have stricter rules. Even exempt sheds need frost-appropriate footings — 36-48 inches depending on your elevation.

Why does my deck permit mention seismic design?

Salt Lake City is in Seismic Design Category D due to the Wasatch Fault. The 2021 IBC requires decks and other structures to be designed with lateral (earthquake) resistance in mind. For most decks, this means the ledger board must be bolted to the rim joist with ½-inch bolts, and posts must have proper footings and connections. A structural engineer can stamp your drawings ($500–$2,000), or the building department can sometimes approve standard details; ask upfront whether your design needs engineer certification.

How much does a residential permit cost in Salt Lake City?

Fees are based on declared project valuation. Most residential permits are 1.5-2.5% of the cost estimate, plus per-unit mechanical and electrical fees ($30–$75 each). A $50,000 addition runs roughly $750–$1,500 in permit and plan-check fees. Add a State of Utah Construction Services surcharge of 1-2%. Bring a detailed quote or cost breakdown to speed intake; vague valuations delay processing.

Can I pull my own electrical permit as a homeowner?

No. Utah and Salt Lake City both require electrical work to be done by a licensed electrician, even on owner-occupied properties. You can pull a building permit for structural work yourself, but you must hire a licensed electrician to pull the electrical subpermit and do the work. Same rule applies to plumbing and HVAC. The electrician usually files the electrical permit; coordinate this with them before you start.

How long does plan review take in Salt Lake City?

Over-the-counter permits (small sheds, fences, minor repairs) are sometimes issued same-day if you have complete documentation. Typical residential projects go into a 2-3 week review cycle. If the examiner flags a seismic, foundation, or code issue, you'll get a 'Request for Revision' and you'll need to resubmit — that adds another 7-10 days. Complex projects with multiple trades can stretch to 4 weeks.

Do I need a soil report for my deck footing?

Probably not for a simple deck in the standard setback. But if you're on clay soils and the building department asks about soil conditions, or if you're doing an addition with new footings, a soil report ($800–$2,500) may be required. The city's soils are expansive clay derived from Lake Bonneville, so frost-heave and lateral expansion are concerns. Ask the department at intake — they'll tell you if you need a geotechnical investigation.

What's the frost depth requirement for footings in Salt Lake City?

Most of Salt Lake City requires footings 36 inches deep, but elevated neighborhoods and mountain properties may push that to 48 inches. The city varies frost depth by elevation and neighborhood. Confirm your exact requirement with the building department; footing inspections are only available once the frost-heave season ends in late spring.

Can I convert my basement to a bedroom without a permit?

No. Any new habitable room — including a basement bedroom — requires a building permit, egress-window inspection (IRC R310), electrical subpermit, and a final approval. Basement bedrooms must have an emergency escape window meeting IRC R310 (minimum 5.7 square feet opening, sill height no more than 44 inches). Plan on 3-4 weeks for review and inspection.

Ready to pull your Salt Lake City permit?

Start with a 5-minute call to the City of Salt Lake City Building Department at 801-535-7600. Have your project type, lot address, and rough scope (deck size, foundation details, new square footage) ready. Tell them you're a homeowner and ask if your project is exempt, over-the-counter, or full plan-check. If you need an engineer or geotechnical report, they'll tell you now. Once you know the requirements, file online through the city portal or in person at Salt Lake City Hall Monday-Friday, 8 AM-5 PM. Bring your cost estimate, drawings (even hand-sketched for small projects), and property deed or mortgage statement to prove ownership. Most homeowners get their first conversation with the building department wrong — they wait. A 10-minute phone call upfront saves weeks of rework and surprises.