Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
A full kitchen remodel in Fayetteville requires a building permit if you're moving walls, relocating plumbing, adding electrical circuits, installing a ducted range hood, or modifying gas lines. Cosmetic-only work — cabinet swap, countertop replacement, appliance substitution on existing circuits — is exempt.
Fayetteville Building Department handles kitchen permits through its online portal and over-the-counter intake (verify current hours at City Hall). Unlike some Georgia municipalities that have shifted entirely to digital submission, Fayetteville still accepts paper plans at the building counter during business hours — a key advantage if your contractor prefers in-person intake and same-day questions with the plan reviewer. The city adopts the 2015 International Building Code (IBC) and International Residential Code (IRC) as amended by Georgia state code, but does NOT have the local amendments some metro-Atlanta jurisdictions add (e.g., Fulton County's flood-zone overlay or the City of Atlanta's commercial-grade kitchen requirements for food-service permits). This means your kitchen permit review timeline is typically faster — 3 to 4 weeks for plan review rather than 5 to 6 weeks in neighboring jurisdictions — because Fayetteville's volume and staff are calibrated for residential-only projects. The permit fee structure is based on project valuation: expect $300 to $1,500 depending on scope, with a baseline of roughly 1.5% of the estimated remodel cost. Fayetteville requires all three sub-permits (building, plumbing, electrical) as separate filings, each with its own fee and inspection sequence; some smaller Georgia towns bundle these, but Fayetteville's three-permit model is standard for a city of its size and actually clarifies accountability (the electrical permit tracks NEC compliance separately from structural issues).

What happens if you skip the permit (and you needed one)

Fayetteville full kitchen remodel permits — the key details

Fayetteville Kitchen permits trigger the building code section most kitchens hit: IRC R602.3, which governs walls and load-bearing. If you are removing or moving any wall, the city requires you to identify whether it is load-bearing and, if so, provide an engineer's letter or calculated beam sizing (IRC R602.6 covers beam design for solid-sawn lumber; engineered beams are even simpler because the stamp is on the product). Many contractors skip this step and submit a permit application with a vague 'remove wall' note; the plan reviewer will reject it with a request for 'load-bearing determination by a professional engineer licensed in Georgia.' This costs $800–$2,000 for a simple beam calc on a standard single-story kitchen. The reason is liability: if a load-bearing wall fails after permit sign-off, Fayetteville Building Department and the city share liability. This is not unique to Fayetteville, but it is the #1 rejection reason in Fayetteville kitchen permits because contractors underestimate the threshold for 'load-bearing confirmation.' If your wall is exterior or runs perpendicular to floor joists only, a competent contractor can argue it's non-load-bearing in the application narrative; the plan reviewer will either accept the argument or ask for the engineer letter. Have that conversation upfront.

Plumbing relocations in Fayetteville kitchens must show three specific details on the plumbing plan: sink location with trap-arm dimension (IRC P3005.1 requires the horizontal drain line from the fixture to the vent to be no longer than 5 feet for a 1.5-inch sink arm — this is a frequent miss), the vent line routing to the roof or wall stack (IRC P3101 governs), and the hot/cold supply lines (no detail required, but the plan should show shutoff valve location under the sink). The Fayetteville plumbing inspector will ask for these details if missing; most rejections are 'trap-arm dimension not shown' or 'vent termination detail missing.' Kitchens in older Fayetteville homes (pre-1980s) often have 1.5-inch drains sized for a single sink; if you are replacing with a double-bowl sink or adding a dishwasher, you may need to upsize the drain line from 1.5 to 2 inches (IRC P3002.2 governs sizing). This can mean opening the sub-floor or crawl space to replace the line — budget an extra $1,000–$2,500 for that discovery. Piedmont red clay soils in north Fayetteville drain slowly; if you are installing a floor drain or sump in the kitchen, expect the inspector to require a gravity or pump exit to daylight, not into the crawl space.

Electrical circuits in kitchens are the strictest code section most homeowners encounter: IRC E3901.1 and NEC 210.52(C) (the kitchen is essentially the one room where circuit density is mandated). You need a minimum of two 20-amp small-appliance branch circuits — one for the refrigerator, one for counter-top outlets (toasters, blenders). These circuits cannot share with other loads; they are dedicated. Additionally, every outlet within 6 feet of the sink must be GFCI-protected (IRC E3801.4); modern code allows one GFCI outlet protecting multiple outlets on the same circuit (daisy-chain protection) or individual GFCI breakers in the panel. The most common electrical rejection in Fayetteville is a plan showing only one 20-amp circuit serving all counters, or no GFCI notation at all. The plan must show: (1) two separate 20-amp circuits for counter and fridge with outlet labels, (2) GFCI protection method (GFCI outlet or breaker) with notation, (3) island outlet circuit if present (IRC E3901.2 requires at least one outlet on any island or peninsula 12 inches or wider). If you are moving the refrigerator to a new location, that outlet must be on its own circuit and cannot be GFCI-protected if the fridge is older (newer units tolerate GFCI, older ones trip under their start-up current). The electrical plan reviewer will ask if you are replacing the fridge; if yes, you can use a GFCI outlet; if you are keeping the old fridge, code typically exempts the fridge outlet from GFCI (IRC E3801.4 exception). Fayetteville's online portal now allows you to upload the electrical plan as a PDF; make sure your contractor's plan is clear, legible, and dimensioned so the reviewer can verify outlet spacing (no more than 48 inches between outlets measured along the countertop).

Range hood ventilation is a plumbing/mechanical permit trigger many homeowners overlook. If you are installing a ducted range hood (not a recirculating filter hood), the duct must exit the building envelope — typically through the exterior wall or roof. IRC M1506.2 requires the duct to be smooth, rigid, or semi-rigid metal (not flex duct inside the wall cavity), and IRC M1506.4 requires an exterior damper (a flapper that closes when the fan is off). The most common rejection is 'duct termination detail not shown' — the plan must show where the duct exits the wall or roof, the size and material of the duct, and the damper detail. If the hood is over an island with no exterior wall nearby, you may need to run duct through the attic or soffit to reach the eave; this must be shown on a framing or mechanical plan. In Fayetteville's warm-humid climate (3A), there is additional concern about condensation: the duct should be insulated if it runs through an unconditioned attic (IRC M1506 does not explicitly require this, but it is best practice and the building official may request it). The mechanical permit fee in Fayetteville is separate from building and electrical; expect $150–$300 for the hood duct. If you are replacing a range hood on the same location with the same duct, a cosmetic upgrade (new motor, filter, face) may not need a permit — confirm with the city before starting.

Gas line work in Fayetteville kitchens — moving a range connection, adding a gas cooktop, or extending the gas stub — is part of the building permit under mechanical code (IRC G2406 governs gas appliance connections). If a licensed plumber or gas fitter is handling the work, they will pull the mechanical permit (or it will be bundled with the plumbing permit). The city requires a gas-line test and inspection before sign-off; the inspector will check for proper sizing (IRC G2413 and G2415 govern sizing based on appliance BTU load), support (no copper tubing in the wall cavity — brass or black-iron tubing only), and connections (flare fittings or solder, with proper shutoff valve). If you are simply replacing a range on an existing gas stub, no permit is required. If you are moving the range to a different wall or adding a new gas line, the permit is mandatory. Many Fayetteville contractors mistake this: they assume 'gas work' is always permitted, but in-place appliance swaps are exempt. The cost to add a gas line is $500–$1,500 depending on distance and routing; the permit fee is $100–$250.

Three Fayetteville kitchen remodel (full) scenarios

Scenario A
Cosmetic cabinet and countertop replacement, same appliances, same outlets — East Fayetteville bungalow
You are keeping the same refrigerator, range, and dishwasher in their current locations and simply replacing cabinets, countertops, and backsplash. The electrical outlets are already in place and functioning; you are not adding new circuits, moving outlets, or installing GFCI protection (it may already be there). The plumbing is untouched: the sink drains to the same location, supply lines are the same, no new fixtures. There are no walls being moved. This is a cosmetic-only remodel and does not require a building permit, plumbing permit, or electrical permit in Fayetteville. You do not need to file anything with the city. However, if your home was built before 1978, the contractor must provide a lead-paint disclosure (EPA RRP rule) before starting work — this is not a permit, but a federal requirement. Cost: $0 in permit fees. Timeline: 0 weeks (no permit process). Inspections: None. The work is generally not code-eligible for inspection, though if the contractor damages a wall or electrical outlet during demolition and repair, that isolated repair might trigger a code official's question if discovered during an unrelated future permit on the property. In practice, Fayetteville does not inspect cosmetic-only kitchen work. You should still ensure the contractor pulls temporary power safely, protects existing vents and ducts, and does not deactivate any shut-off valves or GFCI outlets without re-enabling them post-remodel.
No permit required | Cosmetic work only | Lead disclosure if pre-1978 | $0 in permit fees | No inspections
Scenario B
Island addition with new electrical circuits and ducted range hood, load-bearing wall removed — Peachtree Hills neighborhood, 2,000 sq ft ranch
You are removing a non-load-bearing wall that separates the kitchen from the dining room to open up the floor plan, adding a 4-by-6 island with a cooktop and range hood vented to the exterior, and adding two new 20-amp circuits to serve the island (one for the cooktop, one for counter outlets on the island). This project triggers building, electrical, and mechanical permits. First, the building permit: the wall removal requires a determination of load-bearing status. Your contractor obtains a letter from a Georgia PE (professional engineer) confirming the wall is non-load-bearing, or if it is load-bearing, the PE provides a beam calc showing a 2x10 or engineered beam to replace it. Cost: $800–$2,000 for the PE letter/calc. The framing inspector will check the beam installation and confirm the wall is properly removed. Second, the electrical permit: two new 20-amp circuits from the main panel to the island, with a 4-inch conduit chase running through the wall or under the floor (IRC E3701 governs circuit sizing and branch circuits). The electrical plan must show: outlet locations on the island (cooktop outlet separate from counter outlets), GFCI protection for the counter outlets, and the two new circuits leaving the panel on a clearly labeled wiring diagram. Fayetteville's electrical inspector will verify code compliance during rough-in inspection (before drywall). Third, the mechanical permit: the range-hood duct must be sized (typically 6-inch rigid metal for a 30-inch or larger hood) and routed to the exterior wall, with an exterior damper and termination cap shown on the plan. The cost to rough-in the hood duct (before cabinets) is $400–$800. Total permit fees: Building $500–$1,200 (based on valuation of ~$30,000–$50,000 remodel), Electrical $200–$400, Mechanical $150–$300. Total: $850–$1,900 in permit fees. Timeline: 4–5 weeks for plan review, then 2–3 weeks for construction and inspections (rough electrical, rough plumbing if sink moves, framing/beam verification, rough mechanical, drywall, final inspection). The project cost is likely $35,000–$60,000 all-in (materials, labor, permits). Inspections: Framing (beam installation), electrical rough-in, mechanical rough-in (duct), drywall (to verify no issues), final (all three trades). Stop-work risk if permits are skipped is high: the island electrical work, the removed wall, and the hood duct are all visible and likely to trigger a code-enforcement complaint from a neighbor or inspector during a future unrelated permit.
Permit required | Building + Electrical + Mechanical | PE letter/calc for wall removal $800–$2,000 | Total permits $850–$1,900 | Project cost $35,000–$60,000 | 4–5 weeks plan review | 5 inspections required
Scenario C
Plumbing relocation only: double-bowl sink moved from north wall to island, drain upsized, new vent — 1970s ranch, original 1.5-inch drain
You are moving the kitchen sink from the original north wall location to a new island, which requires plumbing relocation. The existing 1.5-inch drain line is insufficient for a double-bowl sink and dishwasher on the same drain; you must upsize to a 2-inch line (IRC P3002.2 requires 2-inch minimum for double-bowl sink with dishwasher). This means breaking through the sub-floor or crawl-space floor, replacing the old 1.5-inch line with 2-inch PVC, and adding a new vent line that ties into the existing vent stack (IRC P3101 governs vent routing). The new sink location on the island requires a new supply line (copper or PEX) for hot and cold water. No walls are being removed, no electrical circuits are being added (the dishwasher remains on the existing outlet), and no range hood is involved. Building permit: Not typically required if no walls move and the structure is not affected. However, Fayetteville requires a plumbing permit for any fixture relocation (check with the city to confirm — some jurisdictions require a 'plumbing only' permit filing, others bundle it with building). Plumbing permit: Yes, required. The plumbing plan must show: the new sink location with dimensions, the new 2-inch drain line routing from sink to the vent stack (including trap-arm length, which must be ≤5 feet per IRC P3005.1), the new vent line size and routing to roof or wall stack, and the supply line shut-off valve location. Cost: The plumbing work to relocate the drain and vent is $1,500–$3,000 (includes cutting sub-floor, rerouting drain, adding vent, and patching). Permit fee: $200–$400 (typically 2–3% of plumbing project valuation). Timeline: 2–3 weeks plan review (plumbing-only permit is faster than building permits). Inspections: Rough plumbing (before sub-floor is closed), final plumbing (after all connections are made and tested). The critical risk: if the old drain cannot be rerouted to the new sink location without excessive trap-arm length or unsanitary slope, you may need to reroute the entire 1.5-inch drain line to daylight or the septic system, adding $2,000–$4,000 to the cost. This is why plumbing inspection is crucial; the rough plumbing inspection will confirm the trap-arm and vent are compliant before you close the sub-floor with drywall. Cost total: $1,700–$3,400 (work + permit). Stop-work risk: if a future electrical or plumbing permit is pulled on the home and an inspector notices the relocated drain was not inspected, code enforcement can require the sub-floor to be opened and re-inspected retroactively, costing $500–$1,000 and delaying projects by weeks.
Permit required (plumbing only) | Drain line upsized 1.5 to 2-inch | Sub-floor opening/rerouting required | Vent line added to stack | $200–$400 permit fee | $1,500–$3,000 work cost | 2–3 weeks plan review | 2 inspections (rough, final)

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

Fayetteville's permit process: online portal vs. over-the-counter intake

The City of Fayetteville Building Department accepts kitchen permit applications through its online portal (available on the city website) and in-person at the building counter during business hours (Mon–Fri, 8 AM–5 PM; verify current hours). Unlike some Georgia municipalities that mandate digital submission, Fayetteville still accommodates paper plans at the counter, which is helpful if your contractor prefers to ask clarifying questions during intake. The online portal allows you to upload a PDF set of plans, a completed application form, and proof of property ownership (deed or tax statement). Typical plan set for a kitchen remodel: building plan (floor plan showing wall locations, dimensions, and any walls being removed with load-bearing status); electrical plan (outlet and circuit layout with GFCI notation); plumbing plan (sink/drain/vent routing); and mechanical plan if a range hood is ducted. Each sub-permit (building, plumbing, electrical, mechanical) is filed separately, each with its own application and fee.

Plan review timeline in Fayetteville is typically 3–4 weeks from submission to first review comment. The building official or plan examiner will check the application for completeness, then distribute to relevant sub-reviewers (electrical inspector, plumbing inspector, mechanical inspector). If the plans are incomplete or non-compliant, the city issues a rejection or 'Request for Additional Information' (RAI) via email. You then have 10 business days to resubmit corrected plans. Many contractors budget 5–6 weeks from first submission to permit issuance to account for one revision cycle. If you submit incomplete plans (e.g., no GFCI notation on the electrical plan, missing trap-arm dimension on plumbing), expect at least one RAI and a 2–3 week delay. Submitting a complete, professional plan set (drawn by a licensed designer or contractor familiar with IRC) reduces review time to 2–3 weeks.

Fayetteville requires certified contractors for plumbing and gas work (Georgia Code § 34-12 governs plumbing licensing; all licensed plumbers must obtain a permit before work), but allows owner-builders to pull electrical and building permits under Georgia Code § 43-41 if the owner is doing the work themselves. In practice, most homeowners hire a general contractor who coordinates all three permits. The contractor or project manager is responsible for scheduling inspections (rough and final for each trade), ensuring work is completed per code, and obtaining final sign-off from the building official. Final inspection approval releases a 'Permit Closure' or 'Certificate of Occupancy' (for kitchens, typically just permit closure, since the kitchen is not a new occupancy). Once final inspection passes, the permit is closed and the work is deemed compliant.

Load-bearing walls, Piedmont soils, and Fayetteville's climate: why kitchen remodels can get expensive

Fayetteville sits in the Piedmont region of Georgia, characterized by red clay soils (Cecil series) that are highly expansive when wet and shrink when dry. This matters for kitchens because if you are opening a wall and adding an island foundation or moving plumbing drains through the sub-floor, the soil's behavior affects how the foundation drains and where water pooling can occur. The 12-inch frost depth in Fayetteville is relatively shallow (compared to northern states), so exterior kitchen steps or patios don't require frost-protected footings; interior kitchen work is not directly affected by frost. However, if your remodel includes an exterior kitchen door or window opening, IRC R403.1 requires the foundation to extend below the frost line. Piedmont red clay also drains slowly; if the kitchen's plumbing drain runs close to the foundation wall or sub-floor, standing water can accumulate in heavy rain, causing basement moisture or mold issues. Modern kitchens with dishwashers and double sinks generate more drain volume; the plumbing inspector may ask for a floor drain or sump if sub-floor drainage is poor. Budget an extra $500–$1,500 if the inspector requires a sump or floor drain retrofit.

Load-bearing walls in Fayetteville kitchens are typically 2x4 studs running north-south (perpendicular to floor joists) or sitting atop a concrete pad. If you are removing a wall that runs perpendicular to joists and supports the roof or upper floor, a beam calc is mandatory. The PE will specify a 2x10 or 2x12 solid-sawn beam, or more commonly, an engineered LVL or I-joist beam from Weyerhaeuser or similar manufacturer. These beams come with a span rating and NDS (National Design Specification) stamp, simplifying installation. Cost: $40–$80 per linear foot for an engineered beam plus $200–$400 for installation. A typical kitchen-to-dining opening requires a 16–20 foot beam, costing $800–$2,000 in materials and install. The PE letter confirming load-bearing status costs $600–$1,200. Total: $1,400–$3,200 for a wall removal with engineering. Many contractors underestimate this and quote $500–$800, then hit the homeowner with change orders.

Fayetteville's warm-humid climate (IECC zone 3A) means high humidity year-round. Kitchen remodels should include GFCI protection on all counter outlets (already required by code, but often overlooked), proper exhaust ducting for range hoods (insulated duct in unconditioned attics to prevent condensation), and continuous drywall (no gaps in walls that can allow moisture infiltration). If you are opening a wall to frame new electrical or plumbing runs, the building inspector may note that the cavity is left unsealed; modern practice is to caulk and insulate the cavity before drywall to maintain the vapor barrier (IRC R302 governs thermal envelope continuity). Budget $200–$500 for sealing and insulating new cavities. If you are moving plumbing drains, avoid routing them through crawl spaces without sloping toward daylight (IRC P2606 governs crawl-space drainage); a drain that sits in the crawl space can accumulate water and ice in winter, causing freeze-up or slow drainage. Most Fayetteville crawl spaces drain toward the perimeter, so route new drains along existing paths.

City of Fayetteville Building Department
Fayetteville City Hall, Fayetteville, GA (verify address and exact building department location with 770-461-0001 or city website)
Phone: 770-461-0001 (main city line; ask for Building Department or Building Permits) | https://www.fayetteville-ga.us (check 'Permits & Licenses' or 'Building Department' section for online permit portal link)
Monday–Friday, 8 AM–5 PM (verify current hours on city website or call ahead)

Common questions

Do I need a permit if I am just replacing my kitchen cabinets and countertops in the same location?

No. Replacing cabinets, countertops, and backsplash in the same location without moving plumbing, electrical, or gas connections is a cosmetic-only project and does not require a permit in Fayetteville. However, if your home was built before 1978, your contractor must provide a lead-paint disclosure form (EPA RRP rule) before starting demolition. If the old cabinets are built-in and attached to load-bearing walls, remove them carefully to avoid structural damage; this is not a permit issue, but a construction best practice.

My kitchen sink is original (1970s) and I want to relocate it to an island. Do I need a permit?

Yes. Moving a sink (or any plumbing fixture) requires a plumbing permit in Fayetteville. The plumber must submit a plan showing the new drain and vent line routing, verify that trap-arm length does not exceed 5 feet (IRC P3005.1), and ensure the vent line ties into the main vent stack. If the original drain is 1.5-inch and you are adding a double-bowl sink or dishwasher to the new location, the drain must be upsized to 2 inches (IRC P3002.2). Expect a $200–$400 permit fee and 2–3 weeks plan review, plus $1,500–$3,000 in plumbing work.

What if I remove a wall in my kitchen without a permit? What happens?

If a wall removal is discovered by a code officer (often via a neighbor complaint or future permit inspection), the city will issue a stop-work order and require you to either (1) restore the wall, or (2) obtain a retroactive permit and submit engineering documentation proving the wall was non-load-bearing or provide a properly designed and installed beam. Retroactive permits cost 1.5–2x the standard permit fee ($500–$1,500), and if the wall removal has caused structural damage (sagging drywall, cracks, settling), remediation can cost $5,000–$20,000. Additionally, your homeowner's insurance may deny claims related to work done without permits, and the unpermitted work must be disclosed at sale, which can tank the deal or force a retrofit inspection.

Do I need an electrician's license to do electrical work in my kitchen in Fayetteville?

Georgia law allows owner-builders to pull electrical permits for work they perform themselves on their own primary residence under Georgia Code § 43-41. However, most insurance policies and lenders require a licensed electrician to perform electrical work. If you hire an electrician, they must be Georgia-licensed, and their contractor's license must be on the electrical permit. Rough-in inspection must occur before drywall, and final inspection after all connections are made. Do not attempt to hide unpermitted electrical work; inspectors are trained to spot new wiring, outlets, and breaker additions, especially during other permits on the property.

How much does a kitchen permit cost in Fayetteville?

A kitchen remodel permit in Fayetteville costs $300–$1,500 depending on project scope and valuation. A cosmetic-only remodel (no permit) costs $0. A simple electrical and plumbing relocation costs $200–$400 in permits (plumbing only). A full remodel with wall removal, island, new circuits, and range hood costs $850–$1,900 across building, electrical, and mechanical permits. Fees are typically 1.5–2% of the estimated project cost. Get a preliminary estimate from your contractor or the building department based on your project scope.

Do I need a range hood permit in Fayetteville?

If you are installing a recirculating (filterless) range hood that vents back into the kitchen, no permit is required — it is not venting outside. If you are installing a ducted range hood that vents to the exterior (through a wall or roof), a mechanical permit is required in Fayetteville. The plan must show the duct size (typically 6 inches for a 30-inch hood), material (rigid metal, not flex), and exterior termination with a damper cap. The mechanical permit fee is $150–$300, and rough-in inspection occurs before cabinets are installed. If you are replacing an existing range hood on the same duct location with the same ductwork, a simple swap may not require a new permit — confirm with the city building department first.

What is the timeline from permit application to final inspection in Fayetteville?

Typical timeline: 3–4 weeks for plan review (from submission to permit issuance), then 2–4 weeks for construction. The contractor schedules rough-in inspections (plumbing, electrical, framing) during construction, and a final inspection once work is complete. Total elapsed time: 6–8 weeks from permit application to final approval, depending on complexity and your contractor's schedule. Simple plumbing-only permits may be faster (4–6 weeks total); complex projects with wall removal and multiple trades may take 8–10 weeks. Request an expedited review if available (typically no additional cost, but not guaranteed).

Are there any Fayetteville neighborhoods or overlay zones that affect kitchen permits?

Fayetteville does not have the historic-district or flood-zone overlays that neighboring jurisdictions (Atlanta, Fulton County) impose. Kitchen permits in Fayetteville are reviewed under standard IBC/IRC code without additional local amendments. However, if your property is in a future-annexation area or near city limits, verify your jurisdiction with the building department before pulling a permit — some properties are unincorporated county and fall under Fayette County Building Department instead. Call 770-461-0001 to confirm your property is within city limits.

What happens if my contractor does electrical work without a licensed electrician or permit?

Unpermitted electrical work is a serious code violation. If discovered, the city will issue a stop-work order, require the work to be brought up to code (including inspection), and assess penalties ($500–$2,000). Additionally, your homeowner's insurance may deny claims from fire, shock, or damage related to unpermitted wiring. At sale, Georgia requires disclosure of unpermitted work; buyers' lenders will require proof of code compliance or refuse financing. The cost to remediate unpermitted electrical work is high: a licensed electrician must trace the circuit, verify compliance, make corrections, and pass inspection — often $1,500–$3,500 for a full kitchen. Pull the permit upfront; it costs far less.

Do I need a Georgia professional engineer (PE) to sign off on a load-bearing wall removal in my kitchen?

Yes, if the wall is load-bearing. Fayetteville Building Department requires either an engineer's letter stating the wall is non-load-bearing, or a stamped beam design if the wall must be replaced with a beam (IRC R602.6 governs). A simple letter costs $600–$1,200; a full beam calc with installation guidance costs $800–$2,000. Some contractors argue a non-load-bearing determination in writing without an engineer's stamp; the plan reviewer will either accept or request the PE letter. Discuss this with your contractor and building department before design; it's cheaper to determine load-bearing early than to submit plans, get rejected, and pay the engineer as a change order.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current kitchen remodel (full) permit requirements with the City of Fayetteville Building Department before starting your project.