Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
A full kitchen remodel in La Mirada requires building, plumbing, and electrical permits if you're moving walls, relocating plumbing, adding circuits, or venting a range hood to the exterior. Cosmetic-only work (cabinets, counters, appliances on existing circuits, paint, flooring) is exempt.
La Mirada, unlike some Orange County neighbors, enforces the Orange County Building Department (OCBD) amendments to the California Building Code with particular rigor on kitchen electrical layouts. The city requires TWO dedicated small-appliance branch circuits (per NEC 210.52(C)), and La Mirada plan reviewers routinely red-tag submissions that don't show both circuits on the electrical plan with proper counter-receptacle spacing (no receptacle more than 48 inches from the next, GFCI protection on every outlet within 6 feet of the sink). This is more strictly audited here than in, say, Buena Park or Cypress. Additionally, La Mirada sits in a mix of 3B coastal and 5B mountain climate zones; coastal homes rarely have frost-depth concerns, but hillside properties in the eastern part of the city may trigger seismic bracing requirements for gas appliances. The city uses the Orange County Plan Check system, which means your permit goes through OCBD's online portal (not a city-specific one), and plan review typically takes 2-4 weeks for a standard kitchen remodel, with two to three rounds of markups. Lead-paint disclosure is mandatory for any pre-1978 home.

What happens if you skip the permit (and you needed one)

La Mirada full kitchen remodel permits — the key details

La Mirada kitchen remodels are subject to the California Building Code (Title 24, 2022 edition as amended by Orange County) and fall under the Orange County Building Department's jurisdiction. The threshold for requiring a permit is straightforward: any structural modification (wall removal or relocation), any plumbing fixture relocation, any new electrical circuit, gas-line modifications, or exterior-vented range-hood installation triggers the full permit suite (building, plumbing, electrical, and sometimes mechanical). The only true exemptions are cosmetic-only work: cabinet or countertop replacement in place, appliance swaps on existing circuits, interior paint, and flooring that doesn't require structural support changes. IRC R602.3 requires that any load-bearing wall removal include a structural engineer's letter and beam design; the Orange County Plan Check office will not approve a load-bearing wall deletion without this, and La Mirada inspectors enforce this strictly. If you're unsure whether a wall is load-bearing, the safest assumption is yes — most interior walls in kitchen layouts carry floor loads from above or roof load, and engineer involvement costs $500–$1,500 but saves rejection cycles.

Electrical work is the highest-scrutiny category in La Mirada kitchens. NEC 210.52(C) mandates two small-appliance branch circuits dedicated solely to kitchen counter receptacles; these must be 20-amp, 120-volt circuits routed separately from general lighting. La Mirada plan reviewers flag submissions that show only one small-appliance circuit or that combine counter receptacles with other circuits. Counter receptacles must be spaced so that no point along the counter is more than 48 inches from the nearest outlet, and every outlet within 6 feet of the sink must be GFCI-protected (NEC 210.8(A)(6)). A peninsula or island requires at least one outlet for every 12 linear feet. Many homeowners assume their existing kitchen electrical is sufficient; it almost never is. A typical full kitchen remodel adds one to two new dedicated 20-amp circuits for the counter receptacles, a separate 20-amp circuit for the refrigerator, a 240-volt circuit for the range (if electric) or a 120-volt circuit for the range hood ignition (if gas), and often a 240-volt circuit for the dishwasher. The electrical permit fee is typically $150–$300 based on valuation, and the rough and final electrical inspections are mandatory.

Plumbing relocations require a separate plumbing permit and plan. If you're moving the sink to a new location, the drain line must slope at 1/4 inch per foot (minimum) toward the main vent stack, and the trap arm cannot exceed 2 feet 6 inches in developed length before the vent connection (IRC P2722.1). Many kitchens have the vent in a corner or far wall; moving the sink away from that location requires careful planning of the drain route, often running it up through the cabinet toe kick or above-floor-joist routing if the sink moves perpendicular to the existing drain wall. Plumbing inspections occur at rough-in (before drywall) and at final (with all fixtures and water supplied). Supply lines (hot and cold) are less regulated but should be 1/2-inch copper, PEX, or approved plastic in La Mirada; the city does not mandate specific materials but does require code-compliant sizing and protection. If you're adding a second sink or island sink, you're adding two separate drain-vent scenarios, which adds complexity and inspection time. Plumbing permit fees typically run $200–$500.

Gas appliances (ranges, cooktops, wall ovens, or instant-hot-water dispensers) trigger either a modification to the existing gas line or a new gas run. IRC G2406 governs gas appliance connections: gas supply lines must have a manual shut-off valve within 6 feet of the appliance, proper drip loops, and a sediment trap on the supply line. Many kitchens have a single gas line serving the range; if you're relocating the appliance or adding a second gas device, the gas line must be upsized (typically 3/4-inch for two appliances) and the routing must be shown on the mechanical plan. La Mirada does not require a separate gas permit for simple appliance relocations on existing lines, but if the line is extended, rerouted, or a new stub is added, the plumbing permit holder (or a licensed gas fitter) must obtain a gas modification permit through OCBD. Seismic bracing of gas appliances is required by Title 24; La Mirada hillside properties (east of Bloomfield Ave) are in seismic zone 4, and appliances must be strapped to cabinetry or the floor.

Range-hood venting is a detail that catches many remodelers off guard. If the range hood is ducted to the exterior (which is code-required in California for health and odor control — no recirculating hoods allowed in kitchens with gas cooktops), the duct must penetrate the exterior wall. This requires a framing detail showing the hood location, duct sizing (typically 6-inch diameter for a standard range), insulation, and exterior termination with a dampered cap. IRC M1505.2 specifies that the duct must be as short and straight as possible, with no more than 4 elbows and a maximum 30-foot run; every foot of duct and each elbow adds static resistance and reduces fan capacity. The building permit plan set must include a section detail of the hood duct penetration, and the mechanical inspection occurs as part of the final inspection. Some homes have attic venting available; others require wall penetration. If you're adding a new range hood where none existed, you're adding exterior wall penetration, which may trigger exterior siding patch and painting work — factor this into your budget and timeline.

Three La Mirada kitchen remodel (full) scenarios

Scenario A
Cosmetic-only kitchen refresh: cabinets, counters, and appliance swap in existing layout (coastal La Mirada, single-story 1970s ranch)
You're replacing cabinets with semi-custom units in the same footprint, swapping out the Formica countertop for quartz (same-size top, no structural changes), removing the old electric range and replacing it with a new 30-inch electric range on the existing 240-volt circuit, and adding a coat of paint to the walls. The existing sink stays in place. None of these involve structural changes, plumbing relocation, new electrical circuits, or range-hood ducting. Under California Building Code and La Mirada's interpretation, this is purely cosmetic; no permit is required. However, if the countertop installation requires notching the studs or adding new support blocking beneath the counter edge, that triggers a building permit. And if the new range requires a circuit upgrade (e.g., the old circuit was 20-amp and the new range needs 40-amp service), that's a new circuit and requires an electrical permit. In this scenario, assuming the existing circuit serves the new appliance without modification, you can proceed without permits. Cost: cabinets $8,000–$15,000, counters $3,000–$6,000, appliance $1,000–$2,500, paint and labor $2,000–$4,000. Total: $14,000–$27,500, zero permit fees.
No permit required (cosmetic-only) | Cabinet and countertop in-place swap | Existing appliance circuit adequate | Same sink location | Total project cost $14,000–$27,500 | $0 permit fees
Scenario B
Kitchen remodel with sink relocation and range-hood venting added (coastal La Mirada, 1978 Craftsman, island layout, existing range stays in place)
You're moving the sink from the south wall to a new island you're building in the center of the kitchen. The island is 4 feet by 2.5 feet, made of frame-and-panel cabinetry with a drop-in stainless sink and two-handle faucet. You're also adding a 36-inch range hood above the existing gas range (which is staying in place on the south wall) and venting the hood to the exterior through the soffit. The cabinet layout and finishes are new, but no load-bearing walls are being removed. This triggers a building permit (for the island framing, range-hood duct penetration, and exterior wall detail), a plumbing permit (sink relocation, new drain-vent, new supply lines to the island), and likely a mechanical permit addendum (range-hood duct and dampered cap detail). The drain from the sink must run horizontally from the island, underneath the joist cavity or within the floor structure, to the existing vent stack located 12 feet away on the south wall. This requires a 2-inch drain line (IRC P2722 minimum), sloped at 1/4 inch per foot, with a properly sized vent. The vent connection cannot exceed 2 feet 6 inches developed length from the trap. If the vent is too far, you'll need to install a wet vent or an air-admittance valve (Studor vent), adding cost and complexity. The range hood duct (likely 6-inch rigid aluminum) runs from the hood at the south wall up through the attic, across to the exterior wall on the north or east side, and terminates with a dampered cap and dryer-vent-style flange. La Mirada's plan reviewers will require a cross-section detail showing the hood, duct routing, insulation (if attic-routed), and exterior termination. Lead-paint disclosure is required for the 1978 home; you'll need to include a lead-paint permit addendum and follow de minimis or standard work practices per Title 10 CFR 745. Plan review typically takes 3 weeks, with one to two markups. Inspections: rough plumbing (before island cabinetry install), rough electrical (if any circuits added), framing (island base and hood support), range-hood duct (before attic closure), and final (with water on, hood functional). Total project cost estimate: island cabinetry $4,000–$7,000, sink and faucet $800–$1,500, plumbing rough-in and final $1,500–$2,500, range hood and duct $600–$1,200, labor $3,000–$6,000. Total: $10,000–$18,200. Permit fees: building $300–$500, plumbing $250–$400, mechanical addendum $100–$200. Total permits: $650–$1,100.
PERMIT REQUIRED | Plumbing drain-vent relocation | Range-hood exterior venting | Island framing inspection required | Lead-paint disclosure (1978 home) | Three sub-permits (building, plumbing, mechanical) | 3-week plan review | Total project $10,000–$18,200 | Permit fees $650–$1,100
Scenario C
Full kitchen gut remodel with load-bearing wall removal, dual small-appliance circuits, and island prep sink (La Mirada hillside property, 1985 colonial, east of Bloomfield Ave, seismic zone 4)
You're removing the wall between the kitchen and dining room to open the space; this wall carries floor load from the second story above. You're reconfiguring the entire electrical system to add two dedicated 20-amp small-appliance branch circuits (one for the west counter, one for the east counter and island), a new 20-amp circuit for the refrigerator, a 240-volt circuit for a new electric range, and a 120-volt circuit for the range-hood ignition. You're adding a prep sink and dishwasher on the island, and installing a commercial-style 36-inch gas range on the south wall (existing gas line, but appliance strapping required for seismic compliance). You're also venting the range hood to the exterior through the roof (attic penetration). The removal of the load-bearing wall requires an engineer's letter and structural design for a beam to carry the floor load. This is non-negotiable in La Mirada; OCBD will not issue a building permit without the engineer's seal. The engineer will specify beam size (likely a 2x12 or LVL), support posts, and any header modifications. The electrical plan must show both small-appliance circuits with color-coding, counter-receptacle spacing (marking every receptacle location and confirming no point on the counter exceeds 48 inches from the nearest receptacle), GFCI symbols at every outlet within 6 feet of either sink, and load calculations for the new range (240-volt, 50-amp service). Plumbing includes the island sink drain-vent (likely requiring a vent through the ceiling or a Studor valve), the dishwasher rough-in, and supply lines to the island. The gas range on the existing line requires seismic bracing straps per Title 24; La Mirada inspectors enforce this strictly for hillside properties. The range hood duct (6-inch, insulated, routed through the attic to a roof penetration with dampered cap and flashing) requires a mechanical plan detail and a roof penetration detail signed by the structural engineer. Lead-paint testing may be required if the original 1985 finishes include lead paint (testing is optional but recommended). Plan review is 4-6 weeks due to structural review and multiple coordinations. Inspections: foundation/posts (if new support posts are added), framing (load-bearing wall removal, new header installation), plumbing (before drywall), electrical (before rough-in closure, and before final), range-hood duct (before attic closure), gas appliance (seismic bracing and connections), and final. Total project cost estimate: structural engineer $800–$1,500, beam and framing labor $3,000–$5,000, electrical materials and labor $2,000–$3,500, plumbing materials and labor $2,000–$3,500, cabinetry and countertops $8,000–$15,000, appliances (range, hood, dishwasher, fridge) $2,500–$5,000, general labor and finishing $4,000–$7,000. Total: $22,000–$40,500. Permit fees: building $600–$1,000 (structural review adds to base fee), plumbing $300–$500, electrical $250–$400, mechanical addendum $150–$250. Total permits: $1,300–$2,150.
PERMIT REQUIRED | Structural engineer letter + beam design | Load-bearing wall removal | Dual 20-amp small-appliance circuits required | Island sink drain-vent (Studor or through-ceiling) | Gas range seismic bracing (zone 4) | Roof penetration for range hood | 4-6 week plan review | Five+ inspections required | Total project $22,000–$40,500 | Permit fees $1,300–$2,150

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

La Mirada electrical plan review: the two small-appliance circuit requirement and counter-receptacle spacing

La Mirada, under Orange County Building Department jurisdiction, enforces NEC Article 210.52(C) with particular rigidity on kitchen counter receptacles. The code requires two or more 20-ampere, 120-volt branch circuits dedicated exclusively to counter-top receptacles and the refrigerator circuit. Many homeowners and even some contractors assume this means two outlets; it means two separate circuits. If your kitchen counter spans 12 feet and you install six outlets (one every 2 feet), you cannot use a single 20-amp circuit to supply all six. Instead, you need to split them: perhaps outlets 1-3 on circuit A, outlets 4-6 on circuit B. Each circuit is independently protected by its own breaker and runs as a separate wire from the panel. This separation exists because a microwave, toaster, and kettle running simultaneously on a single circuit can exceed 20 amps and trip the breaker. Two circuits give the kitchen redundancy.

Counter-receptacle spacing is measured in a specific way that trips up many homeowners. Imagine standing at the counter edge and looking at the wall. Every point on that wall must be within 48 inches of a receptacle (horizontally, not diagonally). This is checked by the plan reviewer on the electrical drawing and confirmed by the inspector during rough-in. La Mirada inspectors will mark violations during inspection if receptacles are spaced more than 48 inches apart. Peninsulas and islands add complexity: a peninsula with a 2-foot depth and 8-foot length requires receptacles on the top surface (not just the sides), spaced to meet the 48-inch rule from any point on the usable counter. If you have an 8-foot island with a prep sink on one end and stove prep on the other, you'll likely need three to four receptacles to meet spacing.

GFCI (ground-fault circuit interrupter) protection is mandatory on every receptacle within 6 feet horizontally of the kitchen sink (NEC 210.8(A)(6)). This includes counter receptacles adjacent to the sink, island receptacles if the island is within 6 feet of the sink, and even the refrigerator outlet if it's close. La Mirada plan reviewers mark these with special symbols on the electrical plan (a circle with 'GFCI' written inside or colored red). The appliance-circuit receptacles also require GFCI protection as a secondary layer of safety. A common mistake is installing GFCI only at the outlet nearest the sink and assuming the others are protected downstream; that works, but plan reviewers often require GFCI at every outlet within the zone to be explicit on the drawings.

The permitting process for electrical kitchen work in La Mirada involves submission of a one-line electrical diagram (showing the panel, breaker sizes, wire gauges, and circuit assignments), a floor plan with all receptacle locations marked and measured, and details of any special devices (GFCI, dedicated appliance circuits, 240-volt range service). A typical plan review yields 1-2 markup rounds; common red-tags are 'Second small-appliance circuit not shown,' 'Counter receptacle spacing exceeds 48 inches,' 'Refrigerator circuit shown on general lighting circuit — must be separate,' and 'GFCI symbol not shown at all receptacles within 6 feet of sink.' Plan review takes 1-2 weeks. The rough electrical inspection (after wiring is complete but before drywall) confirms wire routing, breaker assignments, and temporary test power. The final electrical inspection (after the service has been energized and all outlets are live) verifies that receptacles are working, GFCI outlets are functioning, and the circuit assignment matches the approved plan.

Plumbing relocation complexity: drain slope, vent sizing, and inspection timing in La Mirada kitchens

When you relocate a kitchen sink in La Mirada, you're not just running new water lines; you're creating an entirely new drain-vent system that must slope and terminate correctly. IRC P2722.1 specifies that the drain line must slope at a minimum of 1/4 inch per foot toward the vent stack. If the sink is 10 feet away from the main vent stack (a typical scenario), the drain outlet at the vent stack must be 2.5 inches lower than the outlet at the sink. This is a fixed geometric constraint: you cannot achieve proper slope if the vent stack is higher than the new sink location or if the distance exceeds the available vertical drop within the floor joists. Many homeowners discover this constraint too late, after cabinetry is ordered. The solution is often to route the drain upward through the cabinet toe kick or above-counter routing (if the sink is relocating to an island in the middle of the kitchen), adding 2-4 weeks to the plan-review timeline because the detail must be engineered and approved.

The vent connection distance is equally critical. The trap arm (the section of drain pipe from the trap outlet to the vent connection) cannot exceed 2 feet 6 inches in developed length (IRC P2722.1). 'Developed length' means the actual path of pipe, counting every foot and every turn. If your sink drain runs horizontally 3 feet to the vent stack and then up, that's already 3 feet developed, exceeding the 2 feet 6 inches limit. The solution is a vent that's within 2 feet 6 inches of the trap, or an air-admittance valve (Studor vent) installed on the island cabinet, which allows air in but not sewer gas out. La Mirada permits both approaches; the Studor vent is faster to install and less visible, but it requires annual inspection to ensure the diaphragm is functioning. Many plan reviewers flag island sinks as 'requires Studor vent detail' or 'requires structural engineer approval for vent routing.' This detail must be shown in section view on the plumbing plan.

Sink drain sizing depends on whether the sink is a single bowl or double bowl, and whether a dishwasher is connected. A single kitchen sink requires a 1.5-inch drain line minimum (IRC P3201.1). A dishwasher connected to the kitchen sink trap requires a larger trap (1.5-inch minimum) and a dishwasher drain connection detail. The trap itself must be accessible for cleaning; cabinetry must be designed with a removable panel or open space below the sink. La Mirada inspectors will look for this accessibility during the rough-in inspection. If you're installing a prep sink on an island in addition to the main sink, you have two separate drain-vent systems, doubling the complexity. Many plan reviewers request a plumbing isometric (3D-like drawing) showing both drain-vent paths, the vent sizing for each, and the connection point at the main vent stack.

The plumbing inspection sequence in La Mirada includes a rough-in inspection (before the sink cabinet is installed and before drywall closes), a test inspection (if the plan includes a pressure test of the supply and drain lines), and a final inspection (after the sink is installed and water is supplied). If the rough-in is not inspected and approved before cabinetry is built, moving the vent or drain to fix a code violation becomes destructive and expensive. Scheduling the rough-in inspection as soon as the framing allows (even if drywall is only halfway done) is critical. La Mirada Building Department typically schedules inspections within 5 business days of request, but kitchen projects often have multiple subtrades working simultaneously, so coordinating plumbing rough-in with framing rough-in and electrical rough-in requires advance planning.

City of La Mirada Building Department
13700 La Mirada Boulevard, La Mirada, CA 90638 (contact City Hall for routing to Building Department)
Phone: (562) 943-0131 ext. Building Permits (confirm extension locally) | https://aca.accela.com/LAMIRADA (Orange County ACA portal; search 'La Mirada building permit' for current URL)
Monday–Friday, 8:00 AM–5:00 PM (verify holiday closures)

Common questions

Do I need permits for a kitchen remodel if I'm only replacing cabinets and counters in the same locations?

No, if the cabinets and counters are purely replacing existing ones in the same footprint with no structural changes, no plumbing relocation, and no electrical work. This is cosmetic-only and exempt. However, if the new countertop requires notching studs for edge support or if you're upgrading an appliance circuit from 20-amp to 40-amp for a new range, permits are required for those specific components. Always confirm with La Mirada Building Department before starting if you're unsure whether your materials or layout changes trigger structural work.

What does it cost to permit a kitchen remodel in La Mirada, and how long does plan review take?

Building permit fees range from $300–$1,500 depending on the project valuation (typically 1.5–2% of the estimated cost of work). A cosmetic kitchen costs less to permit than a full gut remodel with structural changes. Plumbing and electrical permits add $250–$400 each. Plan review typically takes 2–4 weeks for a standard kitchen remodel (sink relocation, new circuits, range-hood venting), and 4–6 weeks if structural engineering (load-bearing wall removal) is required. Two to three markup rounds are typical; each round adds 3–5 business days.

My 1970s kitchen has one small-appliance circuit. Do I really need two for the remodel?

Yes. NEC 210.52(C), enforced by La Mirada, requires two or more 20-ampere, 120-volt circuits dedicated to kitchen counter receptacles. This is not optional. One 20-amp circuit can be overloaded quickly if a microwave, toaster, and coffee maker run simultaneously. Two circuits provide redundancy and prevent nuisance breaker trips. The second circuit requires running a separate wire from your electrical panel (usually 12-gauge copper wire in conduit or Romex) to a second breaker position. Your panel must have available breaker space; if it doesn't, a sub-panel may be required, adding $500–$1,500.

I want to move my sink to an island. What's the biggest complication?

The drain-vent system. The drain must slope 1/4 inch per foot toward the main vent stack, and the trap arm cannot exceed 2 feet 6 inches developed length before the vent. If your island is 8 feet from the vent stack, you'll likely need an air-admittance valve (Studor vent) on the island cabinet to keep the trap arm short. This detail must be shown on the plumbing plan and approved during plan review. Second biggest complication: supply-line routing under or through the cabinetry; if the floor joists don't allow horizontal routing, you may need to go up through the wall or cabinet top, adding cost and visible piping.

Do I need a structural engineer to remove a kitchen wall?

Yes, if the wall is load-bearing (carries floor or roof load from above). Most interior kitchen walls are load-bearing. La Mirada requires a structural engineer's letter and beam design sealed by the engineer before the Building Department will approve the permit. The engineer will specify the beam size, support posts, and any header modifications. This costs $800–$1,500 but is mandatory and non-negotiable. Do not skip this step; the permit will be denied without it.

My home was built in 1977. Does that mean lead-paint permitting?

Possibly. California requires lead-paint disclosure for homes built before 1978 if the interior paint is original. If your home was built in 1977, you must include a lead-paint addendum on the permit and follow de minimis or standard work practices per Title 10 CFR 745. If the kitchen surfaces have been painted over since 1978, you may qualify for exemption if you have proof of the repainting. La Mirada requires disclosure even if testing shows negative. Some contractors recommend lead testing ($300–$500) to avoid the work-practice requirements; if the home is lead-negative, the addendum is waived.

Can I do electrical and plumbing work myself, or do I need licensed contractors?

California Business and Professions Code § 7044 allows owner-builders to perform most construction work themselves, but electrical and plumbing work must be done by a licensed contractor. You can act as the general contractor and hire licensed electrician and plumber subcontractors. Some homeowners hire a 'design-build' contractor who pulls the permit and handles all three trades; others hire separate subs and coordinate. Either way, the electrical and plumbing work cannot be self-performed by an unlicensed homeowner in La Mirada.

How many inspections do I need for a full kitchen remodel?

A full kitchen remodel with structural changes, electrical, and plumbing typically requires 5–7 inspections: framing (if walls are removed or relocated), plumbing rough-in, electrical rough-in, range-hood duct or mechanical (if applicable), drywall (if applicable), gas appliance seismic bracing (if applicable), and final inspection. Each inspection must be scheduled in advance and passed before the next trade begins. Coordinating inspections to avoid project delays requires advance planning with your contractor.

What happens if an inspector finds something doesn't match the approved plan?

If the inspection fails, the inspector issues a deficiency notice listing the non-compliant items. You must correct the work and request a re-inspection (within 5–10 business days). If the correction requires a plan modification (e.g., a receptacle is in the wrong location), you may need to submit a plan amendment and wait for re-approval, adding 1–2 weeks. Frequent deficiencies slow the project and increase the likelihood of lien claims or contract disputes with your contractor. Following the approved plan exactly is critical.

Can I get a variance from the two small-appliance circuit requirement or GFCI spacing?

No. NEC 210.52(C) and 210.8(A)(6) are state-level electrical codes, not local ordinances. La Mirada cannot grant variances from the National Electrical Code. The two circuits and GFCI spacing are non-negotiable. If your kitchen layout makes two circuits logistically difficult (e.g., an extremely small kitchenette in an accessory unit), you still must comply or redesign the layout. Variance requests go to the California Energy Commission, not the local Building Department, and they are rarely granted for electrical safety issues.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current kitchen remodel (full) permit requirements with the City of La Mirada Building Department before starting your project.