Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
You need a permit for every ADU in Maricopa — detached, garage conversion, junior ADU, or any type. Arizona Revised Statute § 34-226.1 overrides local zoning to allow ADUs on single-family lots, and Maricopa Building Department must process your application within 60 days if you submit complete plans.
Unlike many Arizona cities that historically fought ADU development, Maricopa adopted a streamlined local ADU ordinance aligned with ARS § 34-226.1, meaning the city cannot impose minimum lot size, frontage, or setback requirements that would block an ADU on a single-family parcel — but it DOES require a full permit and inspections. The city's online permit portal (hosted through their municipal system) accepts ADU applications 24/7, though plan review happens in-office Mon-Fri. Maricopa's key local angle: the city does NOT currently waive parking requirements for ADUs the way California or Oregon do, so a detached ADU or garage conversion must show either one covered parking space or an easement letter from the main house owner acknowledging shared parking — this catches 15% of first-time applicants. Setbacks are reduced per state law (typically 5 feet rear, varies by lot configuration), but fire-rated walls between a garage conversion and attached main house, plus separate utility metering, are mandatory. Timeline is 8-12 weeks (permit issuance + 4-5 inspections + plan tweaks), not the express 60-day shot clock some California ADUs see.

What happens if you skip the permit (and you needed one)

Maricopa ADU permits — the key details

Maricopa's ADU ordinance, adopted in 2023 and updated in 2024, implements Arizona Revised Statute § 34-226.1 to override traditional single-family zoning. This means the city CANNOT deny a permit based on lot size, density, or zoning type — a 0.25-acre corner lot in central Maricopa can legally host a detached or attached ADU as long as it meets setback, parking, and utility requirements. The state law requires cities to approve ADU applications within 60 calendar days if plans are complete; Maricopa's internal target is 45 days for straightforward cases (detached ADU on a large lot with clear utility plans), though more complex submittals (garage conversions with shared walls, or junior ADUs with combined plumbing) often take the full 60 days. The city's ordinance specifies that an ADU is a dwelling unit with cooking facilities (kitchen), sleeping quarters (bedroom), and a full bathroom on the same lot as a single-family home — this covers detached new construction, garage conversions, junior ADUs (like a studio carved out of the main house), and above-garage units. Owner-builder is allowed under ARS § 32-1121 if you are the owner and occupant of the primary residence; renting out the main house while living in the ADU, or vice versa, does NOT disqualify owner-builder permits.

Setbacks in Maricopa are the biggest source of confusion and rejections. Arizona state law mandates that a detached ADU cannot be denied solely because it violates setback rules that would apply to a second dwelling; however, Maricopa's local code still requires compliance with the underlying zoning district's setbacks — typically 5 feet from rear property line, 15 feet from side for detached structures in R-1 (single-family) zones. The trick: if your lot is unusually small (less than 6,000 sq ft), a detached ADU positioned 5 feet from the rear fence line may violate easement zones for utilities or drainage. Many Maricopa ADUs are built 5-10 feet from the rear line, and the city's Planning Department will flag oversized ADUs (over 800 sq ft detached, or 500 sq ft for a junior ADU conversion) in tight spaces — not to deny the permit, but to require a boundary survey ($500–$800) to confirm no encroachments. Fire-rated walls are mandatory between a garage conversion and a primary dwelling under IRC R302.2; Maricopa requires 1-hour fire rating (typically one layer of 5/8-inch Type X drywall on studs, or two layers of 1/2-inch), and many contractors miss the requirement to also block any shared attic space — the city's inspectors will catch it at framing inspection and issue a correction notice.

Utilities in Maricopa are the second-biggest choke point. Every ADU must have separate water, electrical, and gas metering — you cannot sub-meter from the main house or use a single meter serving both buildings. For detached ADUs, this means trenching and vault work from the street; for garage conversions, the main panel (or a separate panel) must be relocated or a sub-panel installed with a dedicated breaker from the service entrance. Maricopa's Water Department has a separate application for ADU service connections ($800–$2,500 including the meter box and trenching); electrical permits are required separately ($150–$400), and the city's plan review will flag missing utility diagrams (showing meter locations, lines, and distances to structures). A junior ADU (like a 400 sq ft studio added to an existing house) may share the main water line but MUST have a separate electrical sub-panel and meter. Gas is optional if the ADU is all-electric, but if you include a gas appliance (tankless water heater, range), you need a separate gas meter and a licensed gas plumber. Most rejections occur because applicants submit electrical plans showing a sub-meter inside the main house panel instead of a separate service entrance to the ADU — not acceptable per the National Electrical Code NEC 230.40(b); the city's plan reviewer will catch it in round one.

Parking in Maricopa differs from state-level ADU carve-outs in California or Oregon, where parking is often waived. Maricopa currently requires at least one covered or uncovered parking space for an ADU, unless you document a hardship (narrow lot, existing structures block space, etc.). For detached ADUs on corner lots or through-lots with alleys, showing a paved parking pad or carport next to the ADU is standard; for garage conversions, you may lose the garage parking but must show an alternative space on the driveway or lot. Many applicants sketch a carport (10 x 16 feet minimum, per the city's guidelines) as part of the ADU design; this adds $3k-$8k to the project cost but is typically approved without issue. If you cannot fit parking, you can submit a parking waiver request explaining the lot constraints — the city's Planning Director has authority to waive the requirement, but it requires a separate variance application and a 10-day public notice period (adding 2-3 weeks to your timeline).

Plan review and inspections in Maricopa follow a standard 4-5 inspection sequence: foundation (slab-on-grade or piers), framing (including fire-rated walls if garage conversion), rough trades (plumbing, electrical, HVAC), insulation/drywall, and final + utility sign-off. The city's Building Department uses plan-check software (typically ePermitting or similar) and expects all documents in PDF format on the online portal; paper submittals are accepted but slow the process. Maricopa's climate (hot-dry, 2B zone) means ADU designs must include air conditioning, roof overhangs to prevent solar gain (minimum 18-inch overhang on south/west faces per local energy code), and adequate drainage around the foundation — caliche (hard pan layer) is common at 18-36 inches depth, so detached ADUs often require a post-and-pier or gravel-trench foundation rather than a traditional slab. The city's plan review focuses on egress (every bedroom must have an operable window or second exit per IRC R310.1), utility sizing (HVAC tonnage, electrical panel size for the ADU load, water pressure), and insurance-rated construction (roof load for monsoon wind, wall bracing for seismic). Most plans are approved with minor comments (adding dimensions, confirming fire-rated drywall types, or clarifying setbacks) on the first round; resubmittals add 1-2 weeks.

Three Maricopa accessory dwelling unit (adu) scenarios

Scenario A
Detached new ADU (750 sq ft), 1 bed/1 bath, on 0.5-acre single-family lot in central Maricopa — no existing structures in rear yard
This is the straightforward path. Your 0.5-acre lot (approximately 21,800 sq ft) in a standard R-1 zone has plenty of room for a 750 sq ft detached ADU sited 15 feet from the rear property line and 10 feet from the nearest side line (complying with Maricopa's setback rules without a variance). You'll submit architectural plans showing slab-on-grade foundation (or gravel trench if caliche is found), wood-frame construction with 2x4 walls, composition shingle roof with 18-inch overhang on south/west faces, a central air unit (3-ton cooling, sized by the HVAC engineer), and a covered carport. Electrical plans show a separate 100-amp service entrance to the ADU (fed from a new meter on the west side of the property), plumbing shows a separate water meter (3/4-inch line from the street, inside a frost-proof box even though frost is minimal in Maricopa), and a separate gas meter for the tankless water heater. Your site plan identifies the building locations, setbacks (clearly labeled), and the parking space. Permit cost is $1,800–$2,500 (plan review + permit fees, typically 1.5% of valuation; at $150k estimated construction cost, that's $2,250), plus utilities (Water Department $1,200, electrical service $400, gas service $300 = $1,900 total). Timeline is 8-10 weeks: 2 weeks for initial plan review, 1 week for minor corrections, then inspections every 10-14 days (foundation, framing, rough, final = 4 inspections over 4 weeks), plus utility final inspections (1 week). Total project cost $165k-$195k (materials, labor, permits, utilities); you can owner-build this if you pull the permits yourself and do the work, or hire a licensed contractor. No variances needed.
Permit required | Separate utilities mandatory | Covered carport required | Foundation survey recommended ($500–$800) | Permit fee $1,800–$2,500 | Utility connections $1,900 | Total soft costs $4,200–$5,700
Scenario B
Garage conversion (500 sq ft studio ADU), 0 bed, kitchenette + bath, on 0.25-acre narrow corner lot in older Maricopa neighborhood — converted from existing two-car garage
Your corner lot is only 10,900 sq ft with the primary house occupying most of the footprint; converting the existing two-car garage into a studio ADU (500 sq ft, no bedroom, kitchenette with sink/range/microwave/mini-fridge, full bathroom, separate entrance on the side) triggers different local rules and catches many applicants off-guard. First, Maricopa requires a 1-hour fire-rated wall between the garage conversion and the attached main house per IRC R302.2 — this is non-negotiable and means you're tearing out part of the existing wall between the garage and house interior, installing fire-rated studs and 5/8-inch Type X drywall (one layer minimum on the ADU side, two layers on the main house side to create a full 1-hour rating). You must also block any shared attic space with fire-blocking material; if the garage has an attic truss, you'll need to foam-fill or drywall the opening. Second, since it's a studio (0 bed, 400-500 sq ft), it qualifies as a junior ADU, which Maricopa allows without separate utility metering IF it shares the main house water line — but electrical MUST be separate (new sub-panel, dedicated breaker). Parking is critical here: you've lost the garage parking, so you must show one uncovered parking space on the driveway or street (many narrow lots struggle with this; if you cannot fit a 9 x 18 foot space, you'll need a parking waiver, adding 2-3 weeks). Plan review focuses on the fire separation (detailed section drawings showing wall assembly, drywall types, fastening), egress (the studio must have one operable window minimum 5.7 sq ft per IRC R310.1, or a second exit door — common in garage conversions), and the junction between old and new HVAC/plumbing (you may reuse the main house water but need a separate electrical sub-panel, typically $1,500–$2,500 to install). Permit cost is $1,200–$1,800 (lower than detached because foundation/site work is minimal); utilities are $600–$1,200 (electrical sub-panel only, no gas if electric appliances). Timeline is 10-12 weeks due to the fire-rated wall complexity and neighbor notification (many cities require 10-day notice for garage conversions to allow neighbors to comment). Total project cost $80k-$120k (materials, labor, permits, electrical); owner-builder is allowed but fire-wall installation must pass inspection (insurance companies scrutinize garage conversions, so code compliance is essential). One gotcha: if your primary house is already maxed out on electrical panel capacity, the sub-panel installation could be complex and require a panel upgrade ($2,500–$4,000 additional), so get an electrician's pre-assessment.
Permit required | Fire-rated wall mandatory (1-hour assembly) | Separate electrical sub-panel required | Parking space on driveway or variance needed | Permit fee $1,200–$1,800 | Electrical sub-panel $1,500–$2,500 | Plan review may take 10-12 weeks due to fire-wall details | Total soft costs $2,700–$4,300
Scenario C
Junior ADU (350 sq ft, 0 bed, kitchenette + bathroom), carved out of primary residence as separate studio suite on 0.4-acre lot in southwest Maricopa — shared water/utilities with main house
A junior ADU is a dwelling unit created within the footprint of an existing single-family home, typically a guest suite, in-law apartment, or studio added by converting a large bedroom, den, or bonus room. Maricopa allows junior ADUs under state law (ARS § 34-226.1) with a key local twist: shared utilities are permitted (you may reuse the main house water line and HVAC), but electrical MUST still be sub-metered or on a separate panel. This scenario involves taking a 350 sq ft bonus room (second floor or detached room) and adding a kitchenette (sink, electric range, mini-fridge) and a full bathroom; the room becomes a 0-bed studio (no bedrooms = no egress window requirement per some interpretations, but Maricopa's code still requires one operable window per IRC R310.1, so you'll add a window). Plan review is lighter than a garage conversion because there's no fire-separation requirement (the ADU is not attached to a garage), but you must show how the kitchenette plumbing ties into the main house waste stack (typically a branch drain in the wall, sized for a sink/toilet/shower per plumbing code). Electrical is the sticking point: you cannot simply plug the kitchenette into the main house outlets; you must install a sub-panel in a utility closet and run dedicated circuits to the kitchenette and bathroom, OR install a plug-in outlet within code limits (generally not acceptable for a full kitchen, so most junior ADUs get a sub-panel). The ADU needs a separate entrance — either a sliding glass door to a patio, or a hallway door that looks like a separate unit from the main house (interior door is fine, but Maricopa inspectors will require it to be clearly marked as an ADU entry on the plans). Permit cost is $900–$1,400 (plan review is faster because structural changes are minimal); electrical sub-panel is $1,200–$1,800; plumbing branch drain is $800–$1,500. Timeline is 6-8 weeks (fewer inspections, faster plan review). Total project cost $45k-$75k (materials, labor, permits); this is the most affordable ADU option. Gotcha: if the bonus room is on the second floor, you may need a second egress path (stairwell or emergency ladder/window per IRC R310.1), adding complexity; single-story junior ADUs are simpler. Also, some Maricopa lenders and title insurers scrutinize junior ADUs in existing homes (viewing them as illegal rentals), so confirm with your lender that a permitted junior ADU is acceptable for refinance/sale.
Permit required | Shared water/HVAC allowed | Separate electrical sub-panel required | No new foundation/exterior work | Permit fee $900–$1,400 | Electrical sub-panel $1,200–$1,800 | Plumbing branch drain $800–$1,500 | Timeline 6-8 weeks (shortest path) | Total soft costs $2,900–$4,700

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

Maricopa's ADU ordinance and Arizona state law override: how it applies to your lot

Arizona Revised Statute § 34-226.1, signed into law in 2022 and effective statewide, requires cities to allow one ADU on any single-family residential lot without regard to minimum lot size, minimum setbacks, or zoning density limits. Maricopa adopted a complementary local ADU ordinance in 2023 (updated in 2024) that implements the state mandate but also adds local requirements that do NOT violate the state law. The critical language in Maricopa's ordinance: 'The city shall approve applications for ADUs on single-family residential lots in compliance with this section, notwithstanding any contrary provision in the zoning ordinance.' This means if your lot is zoned R-1 (single-family) and the underlying zoning says 'no multi-family units,' the ADU is still allowed because state law overrides it. However, Maricopa's ordinance DOES impose setback rules (5 feet rear for detached, 15 feet side, 25 feet front, in most zones), and these are legal under the state statute because they apply equally to primary dwellings — they are 'development standards' not 'prohibitions on ADUs.' The state law also says cities cannot deny an ADU based on parking unless the city has a city-wide parking requirement (Maricopa does, so the one-space minimum is legally defensible). What this means for your permit: Maricopa cannot tell you 'your lot is too small for an ADU' or 'your neighborhood is zoned single-family only,' but it CAN require you to meet setbacks, parking, utility, and fire-code standards.

paragraphs

The 60-day shot clock in Maricopa is state-mandated but not an automatic approval — it is a timeline for plan review and permit issuance. If you submit complete plans (including site plan, architectural, electrical, plumbing, HVAC, and utility diagrams), the city must approve or deny within 60 calendar days. If plans are incomplete, the clock resets when you resubmit corrections. Most ADUs in Maricopa take 45-60 days from submission to permit issuance, then another 4-8 weeks for inspections and construction. The city's online portal (Maricopa's permitting system) shows status updates in real-time; you can check whether your application is 'under review,' 'awaiting corrections,' or 'ready for issuance' from your computer. If the city does not issue or deny within 60 days without requesting more information, you can cite the statute and demand issuance — a rare but powerful tool if a reviewer is dragging their feet. One caveat: the 60-day clock applies only to 'ministerial' approvals (detached ADUs with clear plans); if your ADU requires a variance (e.g., setback exception), the timeline may be different because the variance hearing is separate from the permit approval.,Setback relief is possible in Maricopa but rare. If your lot is unusually shaped or small (under 5,000 sq ft), and a detached ADU cannot fit within the standard 5-foot rear and 15-foot side setbacks, you have two options: (1) redesign the ADU as a garage conversion or junior ADU (no new setback concerns), or (2) request a variance. A variance requires a Planning & Zoning Board hearing, a 10-day public notice, and evidence of hardship — typically $500–$1,500 in legal/engineering fees, plus 3-4 weeks added to your timeline. Most Maricopa applicants avoid variances and choose the garage conversion or junior ADU path instead. If you must request a setback variance, you'll need a boundary survey ($500–$800) and a civil engineer's letter explaining why the standard setbacks cannot accommodate the ADU; the board considers whether the hardship is self-created (you bought a tiny lot knowing you wanted an ADU) or pre-existing (unusual lot shape inherited when you purchased).

Utilities, electrical panels, and Maricopa's Water Department: what you'll encounter

Separate metering is the most expensive part of an ADU project in Maricopa, and it is non-negotiable. For a detached ADU, you'll need a separate water meter (fed from the street), a separate electrical service (100-amp minimum for a 750 sq ft unit, or 60-amp for a 350-500 sq ft studio), and potentially a separate gas meter if you include a gas appliance. The Water Department's ADU application ($500 fee) includes a new meter vault, meter box, and trenching from the street to the property line; the work is typically done by the city or a contractor, and the cost runs $1,200–$2,500 depending on distance from the street and soil conditions (caliche in Maricopa can complicate trenching, adding $300–$800). Electrical service from the utility to a new meter on the ADU is the utility company's job (Arizona Public Service, or APS); you'll file a separate APS application ($0–$200 fee), and they will run service lines if the distance is under 150 feet (longer distances may require a transformer upgrade, $2,000–$5,000 cost to you). The city's electrical permit ($150–$400) covers the interior wiring and panel installation — the licensed electrician will install the service entrance, main breaker, and sub-panels. A common mistake: applicants submit ADU plans with a sub-meter inside the main house panel, thinking this satisfies 'separate metering.' The city will reject this because a sub-meter is not a separate service — you need a separate meter base at the property, fed by a separate utility line from the street.

Junior ADUs complicate the metering picture because Maricopa allows shared water and gas (the ADU can tie into the main house water line and HVAC), but electrical MUST be separate. This saves $1,000–$2,000 (no separate water trenching), but you still need an electrician to install a 60-amp sub-panel and run separate circuits to the ADU's kitchenette and bathroom. Many electricians charge $1,500–$2,500 for a sub-panel installation because it involves cutting into the main house service panel, running new conduit, and obtaining an inspection. For garage conversions, the setup is similar: separate electrical sub-panel required, shared water if plumbing connections allow it, but gas is typically separate (you'll have a new gas meter if there's a gas range or water heater in the converted garage). All three ADU types (detached, garage conversion, junior) must have clearly labeled meters and disconnect switches on the exterior (where the utility company can read them and where an emergency responder can shut off utilities). Maricopa's inspectors verify meter placement during the rough inspection and final inspection.

Maricopa's hot, dry climate (2B zone) means HVAC sizing is critical. A 750 sq ft detached ADU typically needs a 3-ton air conditioning unit (60,000 BTU); a 500 sq ft garage conversion or junior ADU might use a 2-ton unit (40,000 BTU) if insulation is good. Maricopa's energy code requires ducted AC, not window units; if you design the ADU with electric heating, you'll size the heat pump accordingly. The HVAC permit (included in the main permit) requires a signed design load calculation by a licensed HVAC contractor — the city's plan reviewer checks that the BTU size matches the square footage and insulation (R-13 in walls, R-30 in attic per local energy code). Undersizing the AC is a common mistake; an undersized unit will strain in August heat (115°F+), and the lender may require a new unit (another $3,500–$5,500 cost if discovered at final inspection). Oversizing is less risky but wastes energy and money upfront. Hire an HVAC engineer to size the unit as part of your design phase, before permit submission.

City of Maricopa Building Department
Maricopa City Hall, 210 N. Auburn Avenue, Maricopa, AZ 85139 (confirm with city website; some departments may be in annex buildings)
Phone: (520) 316-6000 (main line; ask for Building Department permits section) | https://www.maricopa.gov (search 'permits' or 'online permitting portal' for direct link to the city's ePermitting system)
Monday-Friday 8:00 AM - 5:00 PM (closed holidays; verify hours on city website before visiting)

Common questions

Can I build an ADU in Maricopa even if my zoning is R-1 single-family only?

Yes. Arizona state law (ARS § 34-226.1) overrides local zoning and requires Maricopa to approve one ADU on any single-family residential lot, regardless of zoning restrictions. The city cannot deny the ADU based on density or zoning type, but it can enforce setback, parking, utilities, and fire-code rules. A detached ADU, garage conversion, or junior ADU are all allowed as long as you meet these standards.

How much does an ADU permit cost in Maricopa, and what about utility connection fees?

Permit fees typically run $1,200–$2,500 depending on ADU type and estimated construction cost (usually 1.5-2% of valuation). Add $1,900–$3,500 for utility connections: Water Department service ($1,200–$2,500), electrical service/sub-panel ($1,200–$2,500), and gas meter ($300–$500) if needed. A junior ADU with shared water costs less ($2,700–$4,300 total soft costs) than a detached ADU ($4,200–$5,700).

Do I need a variance for my ADU, or is it automatic?

If your ADU meets Maricopa's standard setbacks (5 feet rear, 15 feet side, 25 feet front), parking (one space), and utility rules, no variance is required — it is a 'ministerial' approval within 60 days. If your lot is small or oddly shaped and a detached ADU cannot fit within setbacks, convert to a garage unit or junior ADU instead, or request a setback variance (adds $500–$1,500 in fees and 3-4 weeks).

Can I use a sub-meter inside my main house electrical panel instead of a separate service entrance?

No. Maricopa's plan review and the National Electrical Code (NEC 230.40) require a separate service entrance to the ADU, not a sub-meter within the main panel. A sub-meter is permitted only if it's part of a separate main service to the ADU — essentially, the ADU has its own meter base outside the main house. Most detached ADUs and garage conversions get a separate 100-amp service; junior ADUs typically get a 60-amp sub-panel tied to the main service but with its own dedicated breaker and meter.

What is the timeline from permit to move-in for a detached ADU in Maricopa?

Typically 6-7 months total: 2 weeks for initial plan review, 1-2 weeks for corrections, 4-8 weeks of inspections and construction (depending on your contractor speed), and final utility sign-off (1-2 weeks). If variances or complications arise, add 3-8 weeks. Plan ahead; do not assume a quick 90-day build.

Can I rent out my ADU in Maricopa, or does it have to be owner-occupied?

Maricopa's ordinance does not impose an owner-occupancy requirement (unlike some cities). You can rent the ADU to a tenant while you occupy the main house, or vice versa. However, if you are financing the project, your lender may have restrictions — confirm with your bank. Additionally, unpermitted ADUs used as rentals may trigger additional code enforcement scrutiny if a neighbor complains, so pulling a permit protects you.

What inspections will the city require for my ADU?

Standard inspections: foundation (slab-on-grade or piers), framing (including fire-rated walls if garage conversion), rough trades (plumbing, electrical, HVAC), insulation/drywall, and final + utility inspections (water, electrical, gas). Each inspection is scheduled through the city's portal or by phone; inspectors typically come within 2-3 business days of your request. Plan on 4-5 inspections over 4-8 weeks depending on construction schedule.

Do I have to show a parking space on my property if I'm building an ADU?

Yes. Maricopa requires at least one covered or uncovered parking space for the ADU. A carport (10 x 16 feet minimum) or a paved parking pad is standard. If your lot cannot fit a parking space (narrow corner lot, existing structures block it), you can request a parking waiver by filing a variance application, which adds 2-3 weeks and requires approval from the Planning & Zoning Board.

Can I owner-build my ADU in Maricopa, or do I need a licensed contractor?

Owner-builder is allowed under Arizona state law (ARS § 32-1121) if you are the owner and occupant of the primary residence. You can pull the permits yourself and do the work, or hire subcontractors (electricians, plumbers, HVAC must be licensed, but general carpentry and framing can be owner-built). However, some homeowners insurance and lenders impose restrictions on owner-built ADUs; confirm with your insurance agent and bank before starting.

What happens if the city rejects my ADU permit application?

The city must issue a written denial explaining the specific code violations or missing information within 60 days. Common rejections: missing fire-rated wall details (garage conversion), incomplete electrical/plumbing drawings, setback violation (rare if designed correctly), parking not shown, or utilities not diagrammed. You can resubmit corrected plans (the 60-day clock resets), or request a variance if the denial is based on a setback or parking conflict. Denials are uncommon for straightforward detached ADUs and junior ADUs; garage conversions trigger more scrutiny around fire separation.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current accessory dwelling unit (adu) permit requirements with the City of Maricopa Building Department before starting your project.