Research by DoINeedAPermit Research Team · Updated May 2026
The Short Answer
A full kitchen remodel in Madison Heights requires a building permit if you're moving walls, relocating plumbing, adding circuits, or venting a range hood to the exterior. Cosmetic-only work (cabinet swap, appliance replacement) does not.
Madison Heights adopted the 2015 International Building Code with Michigan amendments, and the city enforces it through the Building Department housed at City Hall. The key distinction: Madison Heights treats kitchen remodels as requiring permits whenever structural, mechanical, plumbing, or electrical work crosses the threshold of 'same location, same configuration' — meaning if your sink moves three feet over, if you're adding a dishwasher circuit, or if you're ducting a range hood through an exterior wall, you're pulling permits. Unlike some surrounding Oakland County municipalities that grandfather cosmetic-only work more loosely, Madison Heights Building Department applies the state-adopted code strictly: any relocation of plumbing fixtures, any modification to gas lines, any new branch circuits for small appliances, and any wall removal or structural alteration requires a building permit, plus separate mechanical and electrical permits. The city does not offer over-the-counter approval for kitchen work — all full remodels go to plan review, typically 3–4 weeks, with multiple rough and final inspections (framing, rough plumbing, rough electrical, insulation, drywall, finals). If your project is purely cosmetic (new cabinets in the same footprint, countertops, paint, flooring, appliance swaps on existing outlet/circuit), you do not need a permit, but you do need documented evidence — the city may request before-and-after photos or a contractor's affidavit that no structural, plumbing, or electrical work occurred.

What happens if you skip the permit (and you needed one)

Madison Heights kitchen remodel permits — the key details

The Madison Heights Building Department requires a building permit for any kitchen remodel that involves structural changes, plumbing relocation, electrical work, gas-line modification, or window/door opening changes. The city adopted the 2015 International Building Code (IBC) with Michigan amendments, which means IRC R602 (load-bearing wall alterations require engineer-stamped drawings), IRC E3702 (small-appliance circuits must be dedicated 20-amp circuits, minimum two required in kitchen), and IRC P2722 (kitchen-sink trap-arm and venting requirements) are enforced. If you remove a load-bearing wall to open the kitchen to the dining room, you need a structural engineer's letter and beam sizing — Madison Heights Building Department will not approve a wall removal without it. If you relocate your sink or dishwasher, plumbing must be rerouted with proper slope (1/4 inch per foot minimum), trap-arm length and venting shown on plans, and all connections must meet current code (PEX, copper, or code-approved plastic). If you're adding a new range hood with exterior venting, the duct must be shown on the electrical or mechanical plan — range-hood termination details (cap, flashing, slope) are common rejection points in Madison Heights plan reviews. Any modification to a gas line (relocating a cooktop, moving a wall-mounted oven) requires a licensed plumber and separate mechanical permit; Michigan law does not allow owner-builder work on gas lines. The permit process in Madison Heights is sequential: you submit building, electrical, and plumbing permit applications together (or the contractor does), plan review occurs in parallel, and once approved, you schedule rough-in inspections before proceeding to the next phase of work.

Madison Heights is in Oakland County, which has glacial-till and sandy soils depending on neighborhood — this does not directly affect kitchen permits, but it does affect any below-grade plumbing tie-ins or basement kitchen relocation (rare, but if you're moving plumbing to the basement level, drainage and sump-pump considerations come into play). The city has a 42-inch frost depth, which is relevant if you're removing an exterior wall or adding a new exterior opening during kitchen expansion — but for interior-only remodels, frost depth does not apply. The bigger local factor is that Madison Heights requires all plumbing work to be done by a licensed plumber (Michigan law, enforced locally), and all electrical work must be done by a licensed electrician or the owner-builder (if owner-occupied and homeowner-initiated). The city does NOT allow unlicensed contractors to pull plumbing or electrical permits, so if you're hiring a general contractor, confirm they either have in-house licensed subs or have pre-arranged with sub-trades before you sign the contract. Lead-paint disclosure is required if your home was built before 1978 — you must provide EPA-approved lead-paint disclosure documents to any workers who might disturb paint during demo (contractors must be trained in lead-safe work practices if pre-1978). This is not a permit issue per se, but it is a compliance requirement that can slow down the project if the contractor is not RRP-certified.

The permit fees for a full kitchen remodel in Madison Heights typically run $300–$800 for the building permit (based on project valuation — usually 1.5% of the estimated cost of work), plus separate fees for electrical ($150–$400) and plumbing ($150–$400). If your project includes gas-line work, add a mechanical-permit fee ($75–$150). The city accepts online permit applications through its portal (accessible via the Madison Heights city website), and you can submit plans electronically. However, plan review is not instantaneous — Madison Heights typically takes 3–4 weeks for kitchen-remodel plan review, with at least one round of corrections (common issues: missing kitchen-circuit details, range-hood termination not shown, load-bearing wall analysis missing). Once approved, you pay the permit fee in full, receive your permit card, and schedule inspections. Rough inspections (framing, plumbing rough-in, electrical rough-in) are typically scheduled 24–48 hours in advance through the city's scheduling system; final inspection follows drywall and trim. If any inspector fails the rough stage, you get a correction notice and must remediate before the next inspection — this adds 1–2 weeks per round of corrections. Plan for a 6–8 week total timeline from permit application to final approval.

Madison Heights does not exempt kitchen remodels from permit based on project cost or square footage — unlike some states that exempt work under a certain dollar threshold, Michigan does not have a cost-based exemption for kitchens. The city's exemption list is limited to purely cosmetic work (paint, wallpaper, cabinet refinishing in-place, countertop replacement if no substrate change, appliance replacement on existing outlet/circuit). If you are unsure whether your scope is cosmetic or structural, email the Building Department with photos and a description; they will provide a written determination (typically within 5 business days). Many homeowners assume that replacing cabinets and countertops does not require a permit — and that is true IF the footprint and plumbing location do not change. But if your new cabinet layout moves the sink one foot left, or if you're adding an island with a sink, you now have plumbing relocation and you need a permit. Similarly, appliance replacement is exempt if you're swapping a 24-inch electric range for another 24-inch electric range on the same circuit — but if you're adding a new circuit for an induction cooktop, or if you're upgrading from gas to electric (requiring a new plug location), you need an electrical permit. The Building Department's online FAQ is sparse, so direct contact is the safest approach.

One common gotcha in Madison Heights kitchen remodels is the requirement for two dedicated 20-amp small-appliance branch circuits in the kitchen (per NEC/Michigan amendments to IRC E3702). These must serve countertop receptacles and cannot power other areas or appliances. Many older homes have a single 15-amp kitchen circuit, and when homeowners upgrade, they assume they can add one new circuit and be compliant — but the code requires two circuits, each 20 amps, unshared. If your plan shows only one new circuit, the electrical inspector will red-tag it, and you'll need to run another circuit before final approval. Additionally, all countertop receptacles must be GFCI-protected (per IRC E3801), and they must be spaced no more than 48 inches apart — this is a common rejection point because homeowners and less-experienced electricians sometimes space outlets wider than code allows. Similarly, range-hood venting is often overlooked: if you are installing a new range hood with ductwork to the exterior, the duct must be shown on the mechanical plan, the termination must have a damper and cap, and the duct cannot terminate in an attic or soffit (it must go all the way to exterior air). Madison Heights inspectors verify this during the rough-in inspection, so make sure your electrician or HVAC contractor has the detail locked in before framing is closed.

Three Madison Heights kitchen remodel (full) scenarios

Scenario A
Cosmetic kitchen update — new cabinets and countertops, same footprint and plumbing, appliance swap (Royal Oak neighborhood, 1970s ranch)
You are replacing your dated oak cabinets with new white shaker cabinets in the exact same layout, installing new quartz countertops on the same substrate, and swapping your old electric range for a new electric range on the same 240-volt outlet. The sink stays in the same location, the dishwasher is a direct replacement (same opening, same inlet/outlet), and you are not adding or removing any circuits. This is purely cosmetic work — no structural, plumbing, or electrical changes. Madison Heights Building Department does not require a permit for this project. You do not need to file any applications, pay any fees, or schedule inspections. However, if you are working with a contractor, request written confirmation (an email or letter) from them stating that no structural, plumbing, or electrical work will be performed — this protects you in case the contractor deviates from scope. If the contractor discovers during demo that the cabinet substrate is damaged and needs reinforcement, or if they find old wiring behind the walls and want to upgrade it, that becomes permitted work and you will need to pull permits retroactively (at additional cost and risk). The entire project takes 1–2 weeks, and you do not need to disclose this work on a future sale (it is not considered 'unpermitted work' because no permit was required). Estimated cost: $8,000–$15,000 for cabinets, counters, and basic labor.
No permit required | Cosmetic-only work | Original electrical and plumbing untouched | No inspections | Total project cost $8,000–$15,000 | No permit fees
Scenario B
Moderate remodel with plumbing relocation and new electrical circuit — sink moved 4 feet, island added with cooktop, new 20-amp circuit added (Dequindre neighborhood, 1950s colonial)
You are moving your sink from the south wall to the north wall (4 feet over), which requires new plumbing rough-in, drain relocation, and venting adjustment — this triggers a plumbing permit. You are adding a 30-inch island with a cooktop, which requires gas-line extension (if gas cooktop) or new 240-volt circuit (if electric induction), plus island ventilation ducted to the exterior through an existing wall — this triggers a mechanical permit and electrical permit. Your existing kitchen circuit is a single 15-amp circuit, and the new island cooktop requires its own dedicated 240-volt circuit (50-amp for induction, or gas-line for gas cook) — additionally, you need to add one more 20-amp small-appliance circuit to bring the kitchen up to code (two circuits minimum). This is a full remodel in Madison Heights's eyes: building permit (for the island structure and any wall opening for the vent duct), plumbing permit (sink relocation and gas/water tie-in), and electrical permit (new cooktop circuit, new small-appliance circuit, GFCI on all countertop outlets). Plan review takes 3–4 weeks; the Building Department will request details on the cooktop location, duct routing, load-bearing status of the island, trap-arm slope and length for the relocated sink, and circuit layouts for the new circuits. Once approved, rough-in inspections (framing/island structure, plumbing, electrical) occur over 2–3 weeks, then drywall closes and final inspections follow. Total timeline: 8–10 weeks from permit filing to final approval. Permit fees: building $400–$600, plumbing $200–$350, electrical $200–$350, mechanical $100–$150 = $900–$1,450 total. Estimated construction cost: $25,000–$45,000. This scenario showcases Madison Heights's strict enforcement of plumbing-relocation and multi-circuit electrical rules — the city does not waive the 'two small-appliance circuits' requirement even if one is new, so contractors must plan accordingly.
Building permit required | Plumbing permit required | Electrical permit required | Mechanical permit required | Sink relocation 4 feet | Island with cooktop | Two 20-amp small-appliance circuits required | GFCI on all countertop outlets | Range-hood duct to exterior | Total permit fees $900–$1,450 | Construction cost $25,000–$45,000 | Timeline 8–10 weeks
Scenario C
Load-bearing wall removal to open kitchen to dining room — wall contains 2x6 studs and old plumbing vent, major structural change (Lamphere neighborhood, 1960s ranch, original studs)
You want to remove the wall between your kitchen and dining room to create an open-concept layout. The wall is load-bearing (it runs perpendicular to the direction of the floor joists above and supports the roof structure) and contains old cast-iron plumbing vent-stack routing. This is a major structural alteration and absolutely requires a building permit plus a structural engineer's letter. Madison Heights Building Department will not approve any load-bearing wall removal without a PE-stamped beam sizing and installation drawing. You must hire a structural engineer ($800–$1,500) to analyze the load above the wall, size the appropriate beam (likely a steel or engineered lumber beam, 12–18 inches deep), and design the support posts/columns at each end. The engineer's letter must specify beam material, size, post locations, and bearing on the foundation or existing structure below. Once the engineer's letter is submitted with the building permit application, plan review takes 4–5 weeks because the city's inspector must verify the beam sizing and post details, especially if the beam will be installed in the kitchen (beam depth and headroom affect cabinet/soffit layout). The plumbing vent relocation must be shown on the plumbing plan (vent-stack cannot be cut or rerouted without a plumbing permit — rerouting an old cast-iron vent to plastic PVC-DWV is a common task, but code requires slope, support, and venting to the roof). Rough-in inspections include framing (beam installation and posts), plumbing (new vent routing), and then drywall. This project is slow: structural engineer 2 weeks, permit review 4 weeks, construction and inspections 6–8 weeks = 12–14 weeks total. Permit fees: building $600–$1,000 (higher because of structural work), plumbing $150–$250 = $750–$1,250. Construction cost: $15,000–$30,000 (beam + posts + demo + plumbing vent reroute + drywall). This scenario showcases Madison Heights's requirement for engineer-stamped drawings on load-bearing wall removal — a common mistake homeowners make is assuming a contractor can remove a wall without engineering; Madison Heights does not permit this. The city is strict because structural failure (floors sagging, roof damage) is a safety and long-term liability issue.
Building permit required (structural work) | Plumbing permit required (vent relocation) | Structural engineer letter required ($800–$1,500) | Load-bearing beam sizing required | PE-stamped drawings required | Plumbing vent relocation from cast-iron to PVC-DWV | Rough-in inspections: framing, plumbing, final | Total permit fees $750–$1,250 | Construction cost $15,000–$30,000 | Timeline 12–14 weeks

Every project is different.

Get your exact answer →
Takes 60 seconds · Personalized to your address

Madison Heights plumbing inspection sequence: the kitchen sink relocation trap-arm requirement

When you relocate a kitchen sink in Madison Heights, the plumbing inspector will check three critical details: (1) trap-arm slope and length, (2) vent routing and sizing, and (3) connection to the main drain stack. The trap-arm — the pipe from the sink's P-trap to the point where the vent connects — must have a minimum slope of 1/4 inch per foot (per IRC P2722) and maximum horizontal run of 3 feet 6 inches (per IRC P2701). Many homeowners and less experienced plumbers route the trap-arm with insufficient slope or run it too far before venting, which causes the inspector to red-tag the job. If your sink is being moved more than 3 feet from its original location, the plumber must route the drain to the existing stack (which may be across the kitchen, through the floor, or up the wall — this is why sink relocation is not a trivial cosmetic change). The vent must be a minimum 1.5-inch line for a kitchen sink and must connect within the allowable trap-arm distance; if the distance is greater than 6 inches, the vent must be a continuous 1.5-inch line (no reducing to 1.25 inches mid-run). Madison Heights inspectors are meticulous about vent sizing because improperly sized or sloped vents cause drain slowdowns and air-lock issues post-project. On the rough-in inspection (which occurs before drywall), the inspector will visually check the trap arm slope with a level, measure distances, and verify vent connections. If any measurement is outside code, you must cut out and reinstall the section before proceeding — this adds $500–$1,500 to the project timeline and cost. Pro tip: before the rough-in inspection, have your plumber shoot a photo of the trap-arm slope with a level on top (not a guarantee the inspector will pass it, but it shows due diligence). Also, provide the inspector with a plumbing plan that labels trap-arm length and vent connection point — Madison Heights appreciates when homeowners and contractors show they've thought through code requirements in advance.

The second plumbing gotcha is the vent-stack route if your home has old cast-iron plumbing (common in 1950s–1970s Madison Heights homes). Old cast-iron vent stacks often run vertically through walls and out the roof, but if your kitchen remodel involves wall removal or cabinet repositioning, that vent stack may be in the way. You cannot simply cut the vent or reroute it with flexible dryer duct — the vent must be replaced with code-approved material (PVC-DWV is standard in Michigan) and must maintain the same diameter and slope as the original. If your vent stack is 2 inches (typical for a main stack), the new PVC must be 2 inches; you cannot reduce to 1.5 inches. The replacement is not complicated, but it requires coordination: the plumber must notify the Building Department in advance if the scope changes to include vent-stack replacement, and the inspection sequence may shift (vent-stack work is part of the plumbing rough-in). Rough-in inspection typically occurs before drywall, but if the vent stack extends through multiple floors, the inspector may want to see it before framing is complete (so they can verify the vent is not blocked by new framing). Budget an extra $800–$1,500 for vent-stack replacement if your home has cast-iron plumbing and your remodel scope touches the vent.

Madison Heights electrical permit deep dive: the two 20-amp small-appliance circuit requirement and GFCI spacing

The single largest electrical rejection in Madison Heights kitchen remodels is the failure to show two dedicated 20-amp small-appliance branch circuits on the permit plan. This is not a Madison Heights-specific rule — it is in the National Electrical Code (NEC 210.11(C)(1) and adopted by Michigan in the state electrical code) — but Madison Heights inspectors enforce it strictly, and many homeowners and contractors are unaware of it. The rule states that kitchens must have a minimum of two 20-amp circuits that serve the countertop receptacles, island receptacles (if any), dining-room receptacles (if the room is adjacent and part of the kitchen work), and refrigerator outlet (if one exists in the kitchen). These two circuits cannot be shared with other areas or appliances — they exist solely to support small kitchen appliances (toaster, coffee maker, mixer, etc.). Additionally, the circuits cannot supply lights, dishwasher, garbage disposal, or range. If your kitchen currently has only one 15-amp circuit, you must add at least one new 20-amp circuit, bringing the total to two 20-amp circuits (the old 15-amp circuit must either be disconnected or repurposed for non-countertop use, like a light or refrigerator). During plan review, the Madison Heights electrical inspector will count the circuits shown on the plan, verify they are both 20 amps (not 15 amps), and confirm they are dedicated small-appliance circuits. If the plan shows only one circuit, or if the plan labels the circuits as 'kitchen' without specifying they are dedicated to countertop small appliances, the inspector will issue a rejection notice and require you to revise the plan. This adds 1–2 weeks to the review process.

The second electrical requirement that causes rejections is GFCI (ground-fault circuit interrupter) protection and outlet spacing. All kitchen countertop receptacles must be protected by GFCI (per NEC 210.8(A)(6)), which can be done either via a GFCI breaker in the panel or GFCI outlets daisy-chained. Many homeowners and contractors assume they can install GFCI outlets on the first outlet in the circuit and protect the rest via daisy-chain — this is code-compliant, but the outlets themselves must be spaced no more than 48 inches apart (center-to-center). The 48-inch spacing rule is often missed on permit plans, and inspectors flag it during plan review. Additionally, every countertop section must have a receptacle — if you have a countertop run wider than 48 inches without a receptacle, that is a violation. Island countertops also require receptacles (minimum one receptacle per island countertop, spaced 48 inches from any adjacent outlet). On the permit plan, you must show the location of every receptacle outlet, labeled with voltage and amperage (20-amp for small-appliance circuits, 15-amp for other uses), and if the spacing exceeds 48 inches anywhere, that is grounds for rejection. During rough-in inspection, the inspector will physically measure the outlet spacing and verify GFCI protection is installed. Pro tip for contractors and homeowners: sketch out the outlet locations on the countertop before finalizing the plan — it is much faster to move an outlet on paper than to cut holes and run wire in the wall, then get rejected because spacing is off.

The third electrical consideration is range and cooktop circuits. If you are installing an electric range or cooktop, it requires a dedicated 240-volt circuit sized for the appliance's amperage (typically 40–50 amps for a range, 30–40 amps for a cooktop). This circuit must be direct from the panel (cannot be daisy-chained) and must have a disconnect switch or breaker in plain sight of the appliance (per NEC). If you are replacing a gas range with an electric cooktop, you must also confirm that the existing gas line can be capped off safely (by the plumber) and that the electrical service panel has sufficient capacity for the new cooktop circuit. Many older homes in Madison Heights have 100-amp or 150-amp panels, and adding a 40–50-amp range circuit may exceed the panel's capacity. If panel upgrade is required, that is a separate permit (electrical permit for the panel upgrade) and adds $1,500–$3,000 to the project cost. On the plan, the electrician must show the range/cooktop circuit disconnected from the old panel location (if applicable) and a new circuit routed from the panel to the new appliance location. If the new location is on the opposite side of the kitchen from the old location, the circuit may run under the floor or through the basement — the inspector will verify the wire gauge is appropriate for the distance and amperage, and that the wire is protected from damage (conduit or proper securing). Madison Heights requires this level of detail because electrical failures are fire hazards.

City of Madison Heights Building Department
Madison Heights City Hall, Madison Heights, Michigan (contact city for exact address and mail-in permit submissions)
Phone: Contact Madison Heights City Hall at (248) 585-2200 or Building Department directly | https://www.madisonheightsmichigan.org (navigate to Building Department/Permits section for online submission portal)
Monday–Friday, 8:00 AM–5:00 PM (confirm current hours via city website)

Common questions

Do I need a permit if I am just replacing my cabinets and countertops in the same footprint?

No, if the sink, plumbing, electrical, and appliances remain in their original locations and you are not changing the layout. However, if the new countertops require a substrate replacement (removing old substrate, installing new substrate), the inspector may consider it structural work — consult the Building Department in advance. If the sink moves at all, or if you are adding or removing a fixture, you need a plumbing permit.

What if I am adding a dishwasher to a location that never had one before?

Adding a dishwasher requires a plumbing permit (new water inlet, drain connection, vent if necessary) and an electrical permit (new 120-volt circuit or outlet). The plumbing must connect to the main water supply and drain, and the drain must meet trap-arm and venting requirements. Estimated cost: $800–$1,500 for labor and materials, plus permit fees of $150–$250 per trade.

Can I do the electrical work myself if I own the home?

Michigan allows owner-builders to perform electrical work on owner-occupied residential property if the work is for the owner's personal use — however, you must obtain an electrical permit from Madison Heights Building Department and the work must pass inspection by a licensed city inspector. You cannot perform gas-line work yourself; gas work requires a licensed plumber or gasfitter in Michigan. Most homeowners hire licensed electricians to avoid code violations and ensure insurability.

How long does plan review take for a full kitchen remodel in Madison Heights?

Madison Heights typically completes plan review for kitchen remodels in 3–4 weeks. If there are corrections (missing details, code violations), add 1–2 weeks per round of revisions. Once approved, permit issuance is immediate; construction and inspections typically take 6–8 weeks depending on scope and contractor availability.

What is the total cost of permits for a full kitchen remodel in Madison Heights?

Permit fees typically range from $300–$1,200 depending on the scope and valuation of the project. A building permit runs $300–$600, plumbing $150–$350, electrical $150–$400, and mechanical (if range hood venting) $75–$150. These are in addition to contractor labor and material costs.

My home was built in 1965. Do I need to worry about lead paint during a kitchen remodel?

Yes, homes built before 1978 are presumed to contain lead paint. Contractors must provide you with EPA-approved lead-paint disclosure documents before work begins. Any contractor disturbing paint (during demo, wall cutting, etc.) must be RRP-certified (Renovation, Repair, and Painting) and follow lead-safe work practices. If the contractor is not RRP-certified, you must hire a separate lead-safe work company or stop the project — this is a federal requirement, not just Madison Heights, but it is enforced locally.

Do I need a variance or special approval for a full kitchen remodel in Madison Heights?

Not typically, unless your remodel involves removing a load-bearing wall (requires engineer stamping), expanding the kitchen footprint into a setback area (requires zoning review), or changing a window/door opening. For interior-only remodels within the existing kitchen footprint, no variance is needed — the standard building permit suffices.

What happens if the inspector fails my rough-in inspection?

If the inspector finds code violations (improper outlet spacing, insufficient trap-arm slope, missing GFCI protection, etc.), they issue a 'fail notice' with specific corrections required. You have a set time (usually 5–10 business days) to remediate the issue and request a re-inspection. If corrections are not made, the permit can be suspended or revoked, and you cannot proceed to the next phase of work (framing closure, drywall, etc.).

Can I get a permit extension if my contractor falls behind schedule?

Yes, Madison Heights permits are typically valid for 6–12 months from issuance. If you need more time, you can request a permit extension (usually free for the first extension, small fee for subsequent extensions). Contact the Building Department at least 30 days before the permit expiration date to request an extension.

If I hire a contractor, who is responsible for pulling the permit — me or them?

The contractor typically pulls the permit on your behalf (they have the expertise and relationships with the city). However, you (the property owner) are ultimately responsible for ensuring the permit is pulled before work begins. A licensed contractor in Michigan should automatically pull permits; if they ask you to pull the permit, that is a red flag that they may not be properly licensed or insured. Always confirm the permit number with the contractor before signing a contract.

Disclaimer: This guide is based on research conducted in May 2026 using publicly available sources. Always verify current kitchen remodel (full) permit requirements with the City of Madison Heights Building Department before starting your project.